{"id":83174,"date":"2018-12-10T17:35:18","date_gmt":"2018-12-10T14:35:18","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83174"},"modified":"2018-12-10T17:39:10","modified_gmt":"2018-12-10T14:39:10","slug":"teslanin-50-mwlik-depolama-sistemi-enerji-ulasiminin-zor-oldugu-yerlerde","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teslanin-50-mwlik-depolama-sistemi-enerji-ulasiminin-zor-oldugu-yerlerde\/","title":{"rendered":"(Turkish) Tesla\u2019n\u0131n 50 MW Depolama Sistemi Enerji Ula\u015f\u0131m\u0131n\u0131n Zor Oldu\u011fu Yerlerde!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/83174\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Elon Musk, G\u00fcney Avustralya&#8217;n\u0131n kesintilere e\u011filimli elektrik \u015febekesine yard\u0131mc\u0131 olacak ayn\u0131 zamanda yenilenebilir enerjinin sekt\u00f6rde \u00f6neminin artmas\u0131n\u0131n \u00f6n\u00fcndeki en b\u00fcy\u00fck engellerden biri olan depolama sisteminin k\u0131s\u0131tl\u0131l\u0131\u011f\u0131 probleminin \u00fcstesinden gelecek d\u00fcnyan\u0131n en b\u00fcy\u00fck lityum-iyon pil teknolojisini kullanan sunumunu yapt\u0131ktan bir y\u0131l sonra \u015firketin Avustralya&#8217;da en az iki pil depolama tesisi i\u00e7in planlar\u0131 oldu\u011funu ve gelecekte yurti\u00e7inde ve yurtd\u0131\u015f\u0131nda daha fazla projeye imza atmaya haz\u0131rland\u0131klar\u0131n\u0131 a\u00e7\u0131klad\u0131.<\/strong><\/p>\n<p>Musk\u2019un 100 g\u00fcn i\u00e7inde kurup \u00e7al\u0131\u015ft\u0131rabilece\u011fi ba\u015far\u0131l\u0131 bahsinin sonucu, \u015febekeye yard\u0131mc\u0131 hizmetlerin maliyetinde neredeyse y\u00fczde 75&#8217;lik bir d\u00fc\u015f\u00fc\u015fe katk\u0131da bulunan Hornsdale Depolama Tesisi, devletin <img loading=\"lazy\" class=\"alignleft size-medium wp-image-83175\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/teslanin-50-mw-depolama-sistemi-enerji-ulasiminin-zor-oldugu-bolgelerde-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/teslanin-50-mw-depolama-sistemi-enerji-ulasiminin-zor-oldugu-bolgelerde-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/teslanin-50-mw-depolama-sistemi-enerji-ulasiminin-zor-oldugu-bolgelerde-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/teslanin-50-mw-depolama-sistemi-enerji-ulasiminin-zor-oldugu-bolgelerde-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/teslanin-50-mw-depolama-sistemi-enerji-ulasiminin-zor-oldugu-bolgelerde.jpg 660w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u015febekeyi istikrara kavu\u015fturmas\u0131na, kesintilerin \u00f6n\u00fcne ge\u00e7ilmesine ve maliyetleri d\u00fc\u015f\u00fcrmesine yard\u0131mc\u0131 oldu. Hornsdale depolama tesisinin ba\u015far\u0131s\u0131, G\u00fcney Kore&#8217;de b\u00fcy\u00fck bir alan da dahil olmak \u00fczere d\u00fcnyan\u0131n d\u00f6rt bir yan\u0131ndaki di\u011fer tesislere de yenileme ve iyile\u015ftirme yap\u0131lmas\u0131 i\u00e7in \u00f6nc\u00fc oldu.<\/p>\n<p>Depolama end\u00fcstrisi, k\u00f6m\u00fcr ve gaz gibi geleneksel fosil yak\u0131t kaynaklar\u0131na daha az eri\u015fimi olan G\u00fcney Avustralya gibi yerler i\u00e7in \u00f6nemli bir \u00e7\u00f6z\u00fcm kayna\u011f\u0131. Avustralya Enerji Piyasas\u0131 Operat\u00f6r\u00fc\u2019n\u00fcn a\u00e7\u0131klamas\u0131 do\u011frultusunda (AEMO) Hornsdale frekans kontrol hizmetlerinin sa\u011flanmas\u0131nda \u00f6nemli bir i\u015flev ger\u00e7ekle\u015ftirdi. End\u00fcstri Dan\u0131\u015fman\u0131 Aurecon Group Pty\u2019nin a\u00e7\u0131klamas\u0131na g\u00f6re, g\u00fc\u00e7 enjekte etmekte olan ak\u00fc A\u011fustos ay\u0131nda Queensland-to-New South Wales \u00fczerindeki bir y\u0131ld\u0131r\u0131m \u00e7arpmas\u0131ndan sonra \u015febekeyi stabilize etmek i\u00e7in 100 milisaniye i\u00e7inde yan\u0131t verdi. Neoen, frekans kontrol tepki s\u00fcrelerinin alt\u0131 saniyeye kadar d\u00fc\u015febilece\u011fini ekledi.<\/p>\n<p>Bnef analisti Ali Asghar Hornsdale ile alakal\u0131 \u201cDepolama projesinde olas\u0131 gelir ak\u0131\u015flar\u0131n\u0131 ve getirilerini anlamam\u0131z\u0131 geli\u015ftirdi ve dolayl\u0131 olarak risksiz gelecekteki enerji depolama yat\u0131r\u0131mlar\u0131na yard\u0131mc\u0131 oldu\u201d dedi. Hornsdale&#8217;in kurulu\u015fundan bu yana, Avustralya&#8217;daki kamu ve \u00f6zel sekt\u00f6r taraf\u0131ndan yakla\u015f\u0131k 2.500 megawatt-saat yeni depolama projesi ilan edildi.<\/p>\n<p>\u0130layda BALIK \u2013 Elektrik \/ Elektronik M\u00fchendisi \u2013 ilayda.balik@enerjigazetesi.ist<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Elon Musk, G\u00fcney Avustralya&#8217;n\u0131n kesintilere e\u011filimli elektrik \u015febekesine yard\u0131mc\u0131 olacak ayn\u0131 zamanda yenilenebilir enerjinin sekt\u00f6rde \u00f6neminin artmas\u0131n\u0131n \u00f6n\u00fcndeki en b\u00fcy\u00fck engellerden biri olan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83175,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[42217,42215,42219,42216,42214,34979,19638,34980,26353,19436,2625,42218,67,1009,42222,42221,42220,19437,26829],"views":873,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83174"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83174"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83174\/revisions"}],"predecessor-version":[{"id":83179,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83174\/revisions\/83179"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83175"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83174"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83174"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83174"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}