{"id":83103,"date":"2018-12-08T23:53:42","date_gmt":"2018-12-08T20:53:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=83103"},"modified":"2018-12-08T23:53:42","modified_gmt":"2018-12-08T20:53:42","slug":"cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi\/","title":{"rendered":"(Turkish) CW Enerji&#8217;nin Erzincan\u2019daki 1,1 MW\u2019l\u0131k G\u00fcne\u015f Enerjisi Santrali Hizmete Girdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/83103\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya Organize Sanayi B\u00f6lgesi\u2019nde (OSB) faaliyet g\u00f6steren CW Enerji taraf\u0131ndan Erzincan\u2019da in\u015fa edilen toplam 1,1 megavat kurulu g\u00fcce sahip G\u00fcne\u015f Enerjisi Santrali (GES), ge\u00e7ici kabul\u00fc tamamlanarak, hizmete girdi.<\/strong><\/p>\n<p><span id=\"more-103312\"><\/span>CW Enerji\u2019nin y\u00fcklenici firma olarak panel tedariki, m\u00fchendislik ve uygulama \u00e7al\u0131\u015fmalar\u0131n\u0131 <img loading=\"lazy\" class=\"alignright size-medium wp-image-83104\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/cw-enerjinin-erzincanda-ki-11-mwlik-gunes-enerjisi-santrali-hizmete-girdi.jpg 711w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ger\u00e7ekle\u015ftirdi\u011fi arazi tipi Erzincan GES projesi, 28 g\u00fcnde tamamlanarak, 3 Aral\u0131k\u2019ta al\u0131nan ge\u00e7ici kabulle enerji \u00fcretimine ba\u015flad\u0131. S\u00f6z konusu projenin kurulumunda 3 bin 860 g\u00fcne\u015f paneli ve 17 inverter kullan\u0131ld\u0131. Y\u0131lda 1 milyon 853 bin 800 kilovatsaat elektrik \u00fcretilecek. Y\u0131lda ortalama bin 47 hanenin elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131layabilecek projeyle ayr\u0131ca y\u0131lda yakla\u015f\u0131k bin 391 ton karbondioksit, 4,1 ton k\u00fck\u00fcrt dioksit ve 1,5 ton azot oksit gaz\u0131 emisyonu azalt\u0131m\u0131 sa\u011flanm\u0131\u015f olacak.<\/p>\n<p>T\u00fcrkiye\u2019de 400 megavat\u0131n \u00fczerinde g\u00fcne\u015f enerji santralinin anahtar teslim kurulumu ve panel tedari\u011fini ger\u00e7ekle\u015ftiren firma, ge\u00e7ti\u011fimiz y\u0131l eyl\u00fcl ay\u0131nda yine Erzincan\u2019da 2 megavat kurulu g\u00fcce sahip arazi tipi g\u00fcne\u015f enerjisi santralinin kurulumunu ger\u00e7ekle\u015ftirmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya Organize Sanayi B\u00f6lgesi\u2019nde (OSB) faaliyet g\u00f6steren CW Enerji taraf\u0131ndan Erzincan\u2019da in\u015fa edilen toplam 1,1 megavat kurulu g\u00fcce sahip G\u00fcne\u015f Enerjisi Santrali (GES), [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":83104,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[29014,42172,42171,34868,68,67,1009,8131,42170,2326,13,2569,142,1545,105,26829],"views":1265,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83103"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=83103"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83103\/revisions"}],"predecessor-version":[{"id":83105,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/83103\/revisions\/83105"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/83104"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=83103"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=83103"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=83103"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}