{"id":82961,"date":"2018-12-05T15:48:04","date_gmt":"2018-12-05T12:48:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82961"},"modified":"2018-12-05T15:48:04","modified_gmt":"2018-12-05T12:48:04","slug":"ozbekistanda-20-hidroelektrik-santrali-hes-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozbekistanda-20-hidroelektrik-santrali-hes-kurulacak\/","title":{"rendered":"(Turkish) \u00d6zbekistan\u2019da 20 Hidroelektrik Santrali ( HES ) Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82961\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00d6zbekistan h\u00fck\u00fcmeti taraf\u0131ndan onaylanan enerji sekt\u00f6r\u00fcn\u00fc geli\u015ftirme program\u0131na g\u00f6re \u00fclkede 2020 ile 2024 y\u0131llar\u0131 aras\u0131nda 20 hidroelektrik santrali kurulacak, var olan 21 hidroelektrik santral de yenilenecek.\u00a0<\/strong><strong>\u00d6zbekistan&#8217;da 2020-2024 y\u0131llar\u0131nda 20 hidroelektrik santrali kurulacak.<\/strong><\/p>\n<p>\u00d6zbekistan h\u00fck\u00fcmetinin onaylad\u0131\u011f\u0131 2020-2024\u00a0hidroelektrik enerji sekt\u00f6r\u00fcn\u00fc geli\u015ftirme program\u0131na g\u00f6re, \u00fclkede\u00a04 adet b\u00fcy\u00fck ve 16 adet k\u00fc\u00e7\u00fck hidroelektrik santralinin kurulmas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor. Bu <img loading=\"lazy\" class=\"alignleft size-medium wp-image-82962\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/ozbekistanda-20-hidroelektrik-santrali-kurulacak-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/ozbekistanda-20-hidroelektrik-santrali-kurulacak-300x150.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/ozbekistanda-20-hidroelektrik-santrali-kurulacak-500x251.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/ozbekistanda-20-hidroelektrik-santrali-kurulacak-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/ozbekistanda-20-hidroelektrik-santrali-kurulacak.jpg 658w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>d\u00f6nemde ayr\u0131ca \u00fclkedeki\u00a021 hidroelektrik santrali de yenilenecek.<\/p>\n<p><strong>2.8 milyar kilovatsaat<\/strong><\/p>\n<p>Toplam maliyetinin\u00a02,6 milyar\u00a0dolar\u00a0olaca\u011f\u0131 tahmin edilen proje\u00a0hayata ge\u00e7irildi\u011finde, 2,8 milyar kilovatsaat elektrik \u00fcretimi yap\u0131lacak. Hidroelektrik potansiyelinin y\u00fczde 30&#8217;unu kulland\u0131\u011f\u0131 belirtilen \u00d6zbekistan&#8217;da y\u0131ll\u0131k\u00a0hidroelektrik kapasitesinin 27,5 milyar kilovat saat oldu\u011fu \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Elektrik\u00a0enerjisinin \u00f6nemli bir k\u0131sm\u0131 termik santrallerden sa\u011flanan \u00fclkede,\u00a037 hidroelektrik santral yer almaktad\u0131r.<\/p>\n<p>Hatice K\u00fcbra G\u00fcney \u2013 Elektrik Elektronik M\u00fchendisli\u011fi \u2013 kubra.guney@enerjigazetesi.ist<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00d6zbekistan h\u00fck\u00fcmeti taraf\u0131ndan onaylanan enerji sekt\u00f6r\u00fcn\u00fc geli\u015ftirme program\u0131na g\u00f6re \u00fclkede 2020 ile 2024 y\u0131llar\u0131 aras\u0131nda 20 hidroelektrik santrali kurulacak, var olan 21 hidroelektrik [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82962,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[19,42030,67,1009,42028,26043,42029,26044,23124,10997,26829],"views":2078,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82961"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82961"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82961\/revisions"}],"predecessor-version":[{"id":82963,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82961\/revisions\/82963"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82962"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82961"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82961"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82961"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}