{"id":82797,"date":"2018-12-02T17:47:49","date_gmt":"2018-12-02T14:47:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82797"},"modified":"2018-12-02T17:48:18","modified_gmt":"2018-12-02T14:48:18","slug":"heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak\/","title":{"rendered":"(Turkish) Heat Elektrik, Bursa\u2019da Tavuk G\u00fcbresinden Elektrik \u00dcretimi Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82797\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Heat Elektrik taraf\u0131ndan Bursa\u2019da \u00c7eltik\u00e7i At\u0131k Bertaraf Tesisi ve 3 MW\u2019l\u0131k Biyok\u00fctle Enerji Santrali kurularak tavuk g\u00fcbrelerinden elektrik \u00fcretimi yap\u0131lacak.<\/strong><\/p>\n<p>Kurulacak tesiste 4,0 ton\/saat (96,0 ton\/g\u00fcn) tavuk g\u00fcbresi kullan\u0131lacak olup 3,0 MW elektrik enerjisi <img loading=\"lazy\" class=\"alignright size-medium wp-image-82798\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/12\/heat-elektrik-bursada-tavuk-gubresinden-elektrik-uretimi-yapacak.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>elde edilecek. Elektrik \u00fcretiminde Organik Rankin \u00c7evrimi (ORC) Sistemi kullan\u0131l\u0131p sistemde \u00f6nce t\u00fcrbinde mekanik enerjiye sonra jenerat\u00f6rle elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcr\u00fclecek \u0131s\u0131 enerjisi, tavuk g\u00fcbresi yak\u0131m\u0131ndan sa\u011flanacak ve termal ya\u011f ile aktar\u0131m\u0131 yap\u0131lacak. Elde edilen elektrik enerjisi ise G\u00f6bel TM Mustafakemalpa\u015fa Enerji Nakil Hatt\u0131\u2019ndan SBS Orman \u00dcr\u00fcnleri A.\u015e.\u2019yi besleyen 1\/0 Raven SBA-17\/23-34,5 kV gerilimine verilecek.<\/p>\n<p>65 milyon yat\u0131r\u0131m bedeli olan projenin in\u015faat a\u015famas\u0131n\u0131n 1 y\u0131l, yat\u0131r\u0131m\u0131n\u0131n ekonomik \u00f6mr\u00fcn\u00fcn ise 50 y\u0131l olaca\u011f\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Heat Elektrik taraf\u0131ndan Bursa\u2019da \u00c7eltik\u00e7i At\u0131k Bertaraf Tesisi ve 3 MW\u2019l\u0131k Biyok\u00fctle Enerji Santrali kurularak tavuk g\u00fcbrelerinden elektrik \u00fcretimi yap\u0131lacak. Kurulacak tesiste 4,0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82798,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[1678,29816,41926,958,68,67,1009,41925,2839,38661,26829],"views":1760,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82797"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82797"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82797\/revisions"}],"predecessor-version":[{"id":82799,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82797\/revisions\/82799"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82798"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}