{"id":82212,"date":"2018-11-19T17:27:20","date_gmt":"2018-11-19T14:27:20","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82212"},"modified":"2018-11-19T17:27:20","modified_gmt":"2018-11-19T14:27:20","slug":"cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali\/","title":{"rendered":"(Turkish) CW Enerji&#8217;den Fabrika \u00c7at\u0131s\u0131na G\u00fcne\u015f Enerjisi Santrali"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82212\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya Organize Sanayi B\u00f6lgesi\u2019nde g\u00fcne\u015f paneli \u00fcreten CW Enerji, Antalya ili Serik il\u00e7esinde bir so\u011fuk hava deposunun \u00e7at\u0131s\u0131na kurulumunu ger\u00e7ekle\u015ftirdi\u011fi toplam 242 kWp kurulu g\u00fcce sahip g\u00fcne\u015f enerji santralinin ge\u00e7ici kabul\u00fcn\u00fc tamamlad\u0131. <\/strong><\/p>\n<p>CW Enerji, 02.10.2013 tarihli 28783 say\u0131l\u0131 Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fine uygun olarak, Antalya ili Serik il\u00e7esinde bir so\u011fuk hava deposunun \u00e7at\u0131s\u0131na kurulumunu ger\u00e7ekle\u015ftirdi\u011fi <img loading=\"lazy\" class=\"alignright size-medium wp-image-82213\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1-768x431.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/cw-enerjiden-fabrika-catisina-gunes-enerjisi-santrali1.jpg 869w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>242 kWp<strong> (Kilowatt-Peak)<\/strong> g\u00fcne\u015f enerjisi santralinin kurulumunu tamamlad\u0131.<\/p>\n<p>242 kWp g\u00fcc\u00fcndeki GES projesinde \u00fcretimi CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirilen 880 adet CWT-275-60P marka model g\u00fcne\u015f paneli ve 5 adet HUAWE\u0130 SUN 2000 -36 KTL invert\u00f6r kullan\u0131ld\u0131. CW Enerji\u2019nin y\u00fcklenici firma olarak, panel tedariki, m\u00fchendislik ve EPC(uygulama) ger\u00e7ekle\u015ftirdi\u011fi bu GES projesi 12 g\u00fcnde tamamland\u0131. S\u00f6z konusu projenin 16 Kas\u0131m 2018 tarihinde ge\u00e7ici kabul\u00fc al\u0131nm\u0131\u015f olup, i\u015fletmeye haz\u0131r hale getirilmi\u015ftir.<\/p>\n<p>Tamamlanan proje, 242 kWp kapasitelik kurulumu ile y\u0131lda ortalama 210 hanenin elektri\u011fi yenilenebilir enerji ile kar\u015f\u0131lanabilecek ve y\u0131lda ortalama 281 ton karbondioksit (CO<sub>2<\/sub>), \u00a0314 kilogram azot oksit (NOx), 847 kilogram k\u00fck\u00fcrt dioksit (SO<sub>2<\/sub>) gaz\u0131 emisyonunun azalt\u0131m\u0131na destek verecek. 242 kWp g\u00fcc\u00fcndeki g\u00fcne\u015f enerjisi santralinde g\u00fcnde ortalama, 1.027,6 y\u0131lda ortalama 375.100 kWp g\u00fcc\u00fcnde elektrik enerjisi \u00fcretilmesi planlan\u0131yor.<\/p>\n<p>Tamamlanan 242 kWp g\u00fcc\u00fcndeki g\u00fcne\u015f enerji santrali, Tar\u0131m ve Orman Bakanl\u0131\u011f\u0131 K\u0131rsal Kalk\u0131nmay\u0131 Destekleme Kurumu hibe program\u0131 kapsam\u0131nda %50 geri d\u00f6n\u00fc\u015f\u00fcms\u00fcz hibe fonundan yararlan\u0131larak yap\u0131lm\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya Organize Sanayi B\u00f6lgesi\u2019nde g\u00fcne\u015f paneli \u00fcreten CW Enerji, Antalya ili Serik il\u00e7esinde bir so\u011fuk hava deposunun \u00e7at\u0131s\u0131na kurulumunu ger\u00e7ekle\u015ftirdi\u011fi toplam 242 kWp [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82213,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[29014,26659,34868,67,1009,6014,23416,23133,34925,23131,2663],"views":957,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82212"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82212"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82212\/revisions"}],"predecessor-version":[{"id":82214,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82212\/revisions\/82214"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82213"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82212"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82212"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82212"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}