{"id":82204,"date":"2018-11-19T16:27:39","date_gmt":"2018-11-19T13:27:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82204"},"modified":"2018-11-19T16:28:18","modified_gmt":"2018-11-19T13:28:18","slug":"metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak\/","title":{"rendered":"(Turkish) Metan Gaz\u0131ndan Saatte1200 KW Enerji \u00dcretimi Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82204\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kastamonu\u2019da kat\u0131 at\u0131klardan a\u00e7\u0131\u011fa \u00e7\u0131kan metan gaz\u0131ndan elektrik \u00fcretim tesisinin a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi. G\u00fcnl\u00fck 1200 KW elektrik \u00fcretiminin yap\u0131laca\u011f\u0131 tesiste \u00fcretilen elektrik 13,3 sentten sat\u0131lacak.<\/strong><\/p>\n<p>Kastamonu Belediyesi Mahalli \u0130dareler Birli\u011fi taraf\u0131ndan hayata ge\u00e7irilen metan gaz\u0131ndan elektrik \u00fcretim tesisinin a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi. \u00c7\u00f6plerden a\u00e7\u0131\u011fa \u00e7\u0131kan metan gaz\u0131ndan elektrik enerjisi \u00fcretilerek, ildeki elektrik enerjisinin \u00f6nemli bir k\u0131sm\u0131 kar\u015f\u0131lanacak. 2016 y\u0131l\u0131nda temelleri at\u0131lan ve bug\u00fcn a\u00e7\u0131lan <img loading=\"lazy\" class=\"size-medium wp-image-82205 alignleft\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak2-300x157.jpg\" alt=\"\" width=\"300\" height=\"157\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak2-300x157.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak2-500x262.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak2-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/metan-gazindan-saatte1200-kw-enerji-uretimi-yapilacak2.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>tesis, g\u00fcnde 260 ton \u00e7\u00f6pten olu\u015fan metan gaz\u0131n\u0131 elektrik enerjisine d\u00f6n\u00fc\u015ft\u00fcrecek.<\/p>\n<p>Vali Karadeniz, \u201c\u0130\u015fte bu anlamda kurulan modern \u00e7\u00f6p toplama tesisi ve bu tesiste yap\u0131lan gaz \u00fcretimi bu anlamda geri d\u00f6n\u00fc\u015f\u00fcm\u00fc tam olarak yapmam\u0131z\u0131 sa\u011flayacak. Ama burada alt\u0131n\u0131 \u00e7izece\u011fimiz bir nokta var ki t\u00fcm belediyeler ve il \u00f6zel idaresi el birli\u011fi yapt\u0131\u011f\u0131nda T\u00fcrkiye\u2019ye \u00f6rnek olabilecek projeleri ger\u00e7ekle\u015ftirebilecek oldu\u011funu g\u00f6stermesi bak\u0131m\u0131ndan Kastamonu\u2019nun olduk\u00e7a \u00f6nemli oldu\u011funu d\u00fc\u015f\u00fcn\u00fcyorum. Ve ben inan\u0131yorum ki di\u011fer alanlarda da bu i\u015fbirli\u011fi yap\u0131ld\u0131\u011f\u0131 s\u00fcrece g\u00fczel projeler ortaya \u00e7\u0131kacakt\u0131r. Kastamonu\u2019nun ileriye do\u011fru at\u0131l\u0131m\u0131 h\u0131zlanacakt\u0131r diye d\u00fc\u015f\u00fcn\u00fcyorum\u201d dedi.<\/p>\n<p>Elektrik tesisinde saatte 1200 KW elektrik enerjisi \u00fcretildi\u011fi ifade eden Ba\u015fkan Baba\u015f, \u201cTesisin amac\u0131 \u015fuydu: \u00d6zellikle tesiste metan gaz\u0131 \u00fcretilecek. Bu metan gaz\u0131ndan da burada elektrik motoru \u00e7al\u0131\u015ft\u0131r\u0131larak buradaki gaz\u0131n miktar\u0131na g\u00f6re elektrik enerjisi \u00fcretilecekti ve bu da sa\u011fland\u0131. \u015eu anda g\u00fcc\u00fc 1,6 megawat. \u00dcretti\u011fimiz ise \u015fu anda saatte 1200 KW enerji \u00fcretiyoruz. Kilovat\u0131n\u0131 13,3 sentten anla\u015fmas\u0131n\u0131n tamamlad\u0131k ve sat\u0131\u015f\u0131na ba\u015flad\u0131k. Bu projeyi yap, i\u015flet, devret modeliyle yapt\u0131k. \u0130limiz hem \u00e7evre kirlili\u011finin \u00f6nlenmesi a\u00e7\u0131s\u0131ndan hem \u00fcretim a\u00e7\u0131s\u0131ndan hem de \u00fcretimin maddi olarak \u00e7evrilmesi a\u00e7\u0131s\u0131ndan b\u00fcy\u00fck bir fayda ve yarar sa\u011flam\u0131\u015ft\u0131r\u201d ifadelerini kulland\u0131.<\/p>\n<p>Hatice K\u00fcbra G\u00fcney \u2013 Elektrik Elektronik M\u00fchendisli\u011fi \u2013 kubra.guney@enerjigazetesi.ist<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kastamonu\u2019da kat\u0131 at\u0131klardan a\u00e7\u0131\u011fa \u00e7\u0131kan metan gaz\u0131ndan elektrik \u00fcretim tesisinin a\u00e7\u0131l\u0131\u015f\u0131 ger\u00e7ekle\u015ftirildi. G\u00fcnl\u00fck 1200 KW elektrik \u00fcretiminin yap\u0131laca\u011f\u0131 tesiste \u00fcretilen elektrik 13,3 sentten [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82206,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[25180,34979,19638,26353,67,1009,39550,2186,28602,41512],"views":743,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82204"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82204"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82204\/revisions"}],"predecessor-version":[{"id":82208,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82204\/revisions\/82208"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82206"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82204"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82204"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82204"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}