{"id":82179,"date":"2018-11-18T22:25:29","date_gmt":"2018-11-18T19:25:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82179"},"modified":"2018-11-18T22:25:41","modified_gmt":"2018-11-18T19:25:41","slug":"zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti\/","title":{"rendered":"(Turkish) Zorlu Enerji, 2 RES\u2019inin Lisans S\u00fcresini 49 Y\u0131la \u00c7\u0131kartt\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82179\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>EPDK taraf\u0131ndan Zorlu R\u00fczgar A\u015e\u2019nin Osmaniye\u2019nin Bah\u00e7e il\u00e7esinde kurulu 2 RES\u2019inin lisans s\u00fcreleri 49 y\u0131la \u00e7\u0131kart\u0131ld\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-82180\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti-300x185.jpg\" alt=\"\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti-500x308.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/zorlu-enerji-2-resinin-lisans-suresini-49-yila-cikartti.jpg 760w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Zorlu Enerji Elektrik \u00dcretim A\u015e, %100 ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Zorlu R\u00fczgar Enerjisi Elektrik \u00dcretimi A\u015e\u2019nin Osmaniye ili, Bah\u00e7e il\u00e7esinde kurulu 57 MW kurulu g\u00fcce sahip Sar\u0131tepe R\u00fczgar Enerji Santrali ve 23,3 MW kurulu g\u00fcce sahip Demirciler R\u00fczgar Enerji Santrali\u2019nin \u00fcretim lisanslar\u0131n\u0131n s\u00fcresinin 25 y\u0131ldan 49 y\u0131la \u00e7\u0131kar\u0131lmas\u0131 i\u00e7in EPDK\u2019ya ba\u015fvurmu\u015ftu.<\/p>\n<p>EPDK iki santrale y\u00f6nelik yap\u0131lan ba\u015fvurular\u0131 onaylad\u0131 ve lisanslar\u0131n s\u00fcresini 49 y\u0131l olarak revize etti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.EPDK taraf\u0131ndan Zorlu R\u00fczgar A\u015e\u2019nin Osmaniye\u2019nin Bah\u00e7e il\u00e7esinde kurulu 2 RES\u2019inin lisans s\u00fcreleri 49 y\u0131la \u00e7\u0131kart\u0131ld\u0131. Zorlu Enerji Elektrik \u00dcretim A\u015e, %100 ba\u011fl\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82180,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[41502,41497,41499,67,1009,750,2871,17096,474,35002,24949,231,23318,34960,41498,41500,344,20902,41501,41496],"views":1114,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82179"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82179"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82179\/revisions"}],"predecessor-version":[{"id":82181,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82179\/revisions\/82181"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82180"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82179"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82179"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82179"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}