{"id":82137,"date":"2018-11-17T23:33:35","date_gmt":"2018-11-17T20:33:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=82137"},"modified":"2018-11-17T23:33:35","modified_gmt":"2018-11-17T20:33:35","slug":"manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak\/","title":{"rendered":"(Turkish) Manisa\u2019da G\u00fcnl\u00fck 400 Ton Tavuk G\u00fcbresinden Elektrik \u00dcretimi Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/82137\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Celal Bayar \u00dcniversitesi (MCB\u00dc) b\u00fcnyesindeki Teknokent ile sanayi sekt\u00f6r\u00fcn\u00fcn i\u015f birli\u011fiyle, tavuk g\u00fcbresinden elektrik \u00fcretebilen biyok\u00fctle tesisi kuruldu.<span id=\"more-102926\"><\/span>\u00a05 y\u0131ll\u0131k bir \u00e7al\u0131\u015fma sonucu maliyeti 35 milyon liray\u0131 bulan tesisi, ABD, Japonya, Singapur gibi \u00fclkelerdeki yabanc\u0131 yat\u0131r\u0131mc\u0131lar\u0131n kendi \u00fclkelerinde kurmak i\u00e7in T\u00fcrk m\u00fchendislerden destek istedi\u011fi belirtildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-82138\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/manisada-gunluk-400-ton-tavuk-gubresinden-elektrik-uretimi-yapilacak.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>MCB\u00dc Teknokent ve sanayi sekt\u00f6r\u00fc i\u015f birli\u011fiyle ile olu\u015fturulan biyok\u00fctle tesisi faaliyete ge\u00e7ti. Saruhanl\u0131 il\u00e7esi M\u00fctevelli Mahallesi\u2019nde tavuk yumurtas\u0131 \u00fcreten \u00f6zel bir firmada, tavuk g\u00fcbresinden elektrik \u00fcretimi yap\u0131labilen tesis kurulumu yap\u0131ld\u0131.<\/p>\n<p>Tesisin sisteminin, d\u00fcnyada ilk oldu\u011fu belirtilirken 5 y\u0131ll\u0131k Ar-Ge \u00e7al\u0131\u015fmas\u0131 sonucu ge\u00e7ti\u011fimiz ekim ay\u0131nda 11 mw elektrik enerjisi \u00fcretmeye ba\u015flad\u0131. Tesiste g\u00fcnl\u00fck 400 ton ya\u015f g\u00fcbre kurutulup, termal enerjiye \u00e7evriliyor. Firma \u00fcretilen \u0131s\u0131 ve elektrik enerjisini kendi kullan\u0131rken artan miktar\u0131 ise enerji da\u011f\u0131t\u0131m firmas\u0131na satarak, maddi gelir sa\u011flamaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Celal Bayar \u00dcniversitesi (MCB\u00dc) b\u00fcnyesindeki Teknokent ile sanayi sekt\u00f6r\u00fcn\u00fcn i\u015f birli\u011fiyle, tavuk g\u00fcbresinden elektrik \u00fcretebilen biyok\u00fctle tesisi kuruldu.\u00a05 y\u0131ll\u0131k bir \u00e7al\u0131\u015fma sonucu maliyeti [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":82138,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[35143,29816,35325,41460,63,67,1009,41461,41463,18702,38661,41462],"views":1420,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82137"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=82137"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82137\/revisions"}],"predecessor-version":[{"id":82139,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/82137\/revisions\/82139"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/82138"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=82137"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=82137"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=82137"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}