{"id":81838,"date":"2018-11-11T14:57:13","date_gmt":"2018-11-11T11:57:13","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=81838"},"modified":"2018-11-11T14:57:51","modified_gmt":"2018-11-11T11:57:51","slug":"dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor\/","title":{"rendered":"(Turkish) D\u00fcnyan\u0131n En B\u00fcy\u00fck Gelgit Ak\u0131m\u0131 Projesine \u0130ki Yeni T\u00fcrbin \u0130lave Ediliyor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/81838\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Simec Atlantis, MeyGen\u2019in kapasitesini 10 megawatt\u2019a y\u00fckseltiyor. \u015eirket daha b\u00fcy\u00fck pervanelerle maliyetleri d\u00fc\u015f\u00fcrmeyi de planlamaktad\u0131r. Yenilenebilir enerji geli\u015ftirici \u015firketi olan Simec Atlantis Energy Ltd., iki yeni t\u00fcrbin ekleyerek \u0130sko\u00e7ya\u2019daki gel-git ak\u0131m\u0131 projesini geni\u015fletme plan\u0131n\u0131 a\u00e7\u0131klad\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-81839\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor-300x193.jpg\" alt=\"\" width=\"300\" height=\"193\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor-300x193.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/dunyanin-en-buyuk-gelgit-akimi-projesine-iki-yeni-turbin-ilave-ediliyor.jpg 599w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <\/strong><\/p>\n<p>MeyGen tesisi, \u015fu anda 6 megavatl\u0131k bir kapasiteye sahip ve geni\u015fleme ile 10 megawatt\u2019a ula\u015facak. Proje, Avrupa Komisyonu\u2019nun 16,8 milyon euro\u2019luk (19 milyon dolar) destek paketiyle finanse edildi. Atlantis, daha b\u00fcy\u00fck pervaneler, daha g\u00fc\u00e7l\u00fc jenerat\u00f6rler ve tek bir ihracat kablosu kullanarak maliyetleri d\u00fc\u015f\u00fcrmeye \u00e7al\u0131\u015f\u0131yor.<\/p>\n<p>\u0130cra Kurulu Ba\u015fkan\u0131 Tim Cornelius, bu geni\u015flemenin, MeyGen sahas\u0131n\u0131n daha sonra 80 megawatt daha fazla geni\u015fletilmesi ve sonu\u00e7ta 400 megawatt\u2019l\u0131k tam saha kapasitesine ula\u015ft\u0131r\u0131lmas\u0131 i\u00e7in \u00f6nemli bir kolayla\u015ft\u0131r\u0131c\u0131 etken olaca\u011f\u0131n\u0131 belirtti.<\/p>\n<p><a href=\"https:\/\/www.bloomberg.com\/news\/articles\/2018-10-30\/world-s-biggest-tidal-stream-project-to-add-two-new-turbines\">Bloomberg<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Simec Atlantis, MeyGen\u2019in kapasitesini 10 megawatt\u2019a y\u00fckseltiyor. \u015eirket daha b\u00fcy\u00fck pervanelerle maliyetleri d\u00fc\u015f\u00fcrmeyi de planlamaktad\u0131r. Yenilenebilir enerji geli\u015ftirici \u015firketi olan Simec Atlantis Energy [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":81839,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[41195,3969,67,1009,501,41192,13297,41194,35002,24949,231,23318,34960,324,36999,41193,41197,41196,26829],"views":982,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81838"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=81838"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81838\/revisions"}],"predecessor-version":[{"id":81840,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81838\/revisions\/81840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/81839"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=81838"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=81838"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=81838"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}