{"id":81563,"date":"2018-11-05T15:10:40","date_gmt":"2018-11-05T12:10:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=81563"},"modified":"2018-11-05T15:10:40","modified_gmt":"2018-11-05T12:10:40","slug":"turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha\/","title":{"rendered":"(Turkish) T\u00fcrkiye\u2019nin Ye\u015fil Enerji Lideri G\u00dcR\u0130\u015e\u2019ten Bir \u0130lk Daha"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/81563\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin Jeotermal Enerji Sekt\u00f6r\u00fcnde ilk \u201cdual-flash&#8221; teknolojili jeotermal enerji santralini kuran G\u00dcR\u0130\u015e Holding, T\u00fcrkiye\u2019nin yerli kaynaklarla kurulu g\u00fcc\u00fcn\u00fc art\u0131rmay\u0131 hedefleyerek en verimli ve lider Jeotermal enerji santrallerinin yat\u0131r\u0131mlar\u0131na devam ediyor.<img loading=\"lazy\" class=\"alignright wp-image-81564 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha-300x234.jpg\" alt=\"\" width=\"300\" height=\"234\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha-300x234.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha-500x390.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha-64x50.jpg 64w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/turkiyenin-yesil-enerji-lideri-guristen-bir-ilk-daha.jpg 625w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> <\/strong><\/p>\n<p>Ayd\u0131n Germencik il\u00e7esinde, <strong>25 MW kapasiteli EFE 7 Jeotermal Enerji Santrali<\/strong>\u2019nin yap\u0131m\u0131 tamamland\u0131. Devreye al\u0131nmas\u0131yla <strong>y\u0131lda 200.000.000 kWs<\/strong> elektrik \u00fcretilecek olup, 85.000 hanenin elektrik ihtiyac\u0131 milli kaynaklar kullan\u0131larak kar\u015f\u0131lanm\u0131\u015f olacak.<\/p>\n<p>2000 y\u0131l\u0131ndan beri yenilenebilir enerji alan\u0131nda yat\u0131r\u0131mlar\u0131n\u0131 devam ettiren G\u00dcR\u0130\u015e Holding, faaliyete ge\u00e7irmi\u015f oldu\u011fu EFE 6 Jeotermal Enerji Santrali\u2019nden sonra hizmete a\u00e7t\u0131\u011f\u0131<strong> EFE 7, <\/strong>jeotermal enerji alan\u0131nda <strong>toplam kurulu g\u00fcc\u00fcn\u00fc 210 MW\u2019 a \u00e7\u0131kartm\u0131\u015f olacak<\/strong>.<\/p>\n<p>G\u00dcR\u0130\u015e, 9 R\u00fczg\u00e2r Enerji Santrali, 7 Jeotermal Enerji Santrali ve 6 Hidroelektrik Santrali ile toplamda <strong>22 Ye\u015fil Enerji Santrali <\/strong>ile <strong>828 MW<\/strong>kurulu g\u00fc\u00e7 kapasitesine ula\u015fm\u0131\u015ft\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin Jeotermal Enerji Sekt\u00f6r\u00fcnde ilk \u201cdual-flash&#8221; teknolojili jeotermal enerji santralini kuran G\u00dcR\u0130\u015e Holding, T\u00fcrkiye\u2019nin yerli kaynaklarla kurulu g\u00fcc\u00fcn\u00fc art\u0131rmay\u0131 hedefleyerek en verimli ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":81564,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[40986,40987,34979,19638,19,67,1009,6320,16077,16737,35055,23226,34986,34985,36184,33702,34977,26829,2469,6719,40780,40985],"views":1194,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81563"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=81563"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81563\/revisions"}],"predecessor-version":[{"id":81565,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81563\/revisions\/81565"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/81564"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=81563"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=81563"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=81563"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}