{"id":81480,"date":"2018-11-03T23:41:53","date_gmt":"2018-11-03T20:41:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=81480"},"modified":"2018-11-04T00:37:01","modified_gmt":"2018-11-03T21:37:01","slug":"ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirildi\/","title":{"rendered":"(Turkish) \u00d6zelle\u015ftirme \u0130daresi&#8217;nce 4 Hidroelektrik Santrali ( HES ) \u00d6zelle\u015ftirildi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/81480\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131\u2019n\u0131n (\u00d6\u0130B), ikisi Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait olan 4 hidroelektrik santralinin i\u015fletme haklar\u0131n\u0131n devri i\u015flemleri Cumhurba\u015fkanl\u0131\u011f\u0131 Karar\u0131 ile onayland\u0131.<\/strong><\/p>\n<p>\u00d6\u0130B, G\u00f6nen Hidroelektrik Santrali ve Tohma Hidroelektrik Santrali ile Elektrik \u00dcretim A\u015e\u2019ye ait <img loading=\"lazy\" class=\"alignleft size-medium wp-image-81481\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirdi-300x183.jpg\" alt=\"\" width=\"300\" height=\"183\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirdi-300x183.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirdi-500x305.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirdi-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/ozellestirme-idaresince-4-hidroelektrik-santrali-hes-ozellestirdi.jpg 656w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>S\u00fct\u00e7\u00fcler Hidroelektrik Santrali ve Dinar-2 Hidroelektrik Santrali\u2019nin i\u015fletme haklar\u0131n\u0131n devri ile ilgili ihaleleri tamamlam\u0131\u015ft\u0131. Cumhurba\u015fkanl\u0131\u011f\u0131, yay\u0131nlad\u0131\u011f\u0131 kararla 4 santralin i\u015fletme haklar\u0131n\u0131n devri i\u015flemlerine de onay verdi.<\/p>\n<p>Buna g\u00f6re G\u00f6nen Hidroelektrik Santrali\u2019nin i\u015fletme hakk\u0131, 65.160.000 TL bedelle en y\u00fcksek teklifi veren Altek Alarko Elektrik Santralleri Tesis \u0130\u015fletme ve Ticaret A\u015e\u2019nin ve Tohma Hidroelektrik Santrali\u2019nin i\u015fletme hakk\u0131 ise 57.500.000 TL bedelle en y\u00fcksek teklifi veren ERG Altyap\u0131 \u0130n\u015faat Turizm Ticaret Sanayi Ltd. \u015eti.\u2019nin oldu.<\/p>\n<p>E\u00dcA\u015e\u2019a ait iki santralden S\u00fct\u00e7\u00fcler Hidroelektrik Santrali\u2019nin i\u015fletme hakk\u0131, 8.620.000 TL bedelle en y\u00fcksek teklifi veren GNE Elektrik \u00dcretim A\u015e\u2019nin; Dinar-2 Hidroelektrik Santrali\u2019nin i\u015fletme hakk\u0131 ise 8.001.000 TL bedelle en y\u00fcksek teklifi veren \u00d6zce Madencilik ve Ticaret Ltd. \u015eti.\u2019nin oldu.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00d6zelle\u015ftirme \u0130daresi Ba\u015fkanl\u0131\u011f\u0131\u2019n\u0131n (\u00d6\u0130B), ikisi Elektrik \u00dcretim A\u015e\u2019ye (E\u00dcA\u015e) ait olan 4 hidroelektrik santralinin i\u015fletme haklar\u0131n\u0131n devri i\u015flemleri Cumhurba\u015fkanl\u0131\u011f\u0131 Karar\u0131 ile onayland\u0131. \u00d6\u0130B, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":81481,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[30873,34294,40928,9118,67,1009,40930,40931,1033,5258,40932,26043,14968,70,26044,2054,1954,1248,2998,3235,40927,40934,40929,40933,26829],"views":1478,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81480"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=81480"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81480\/revisions"}],"predecessor-version":[{"id":81484,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81480\/revisions\/81484"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/81481"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=81480"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=81480"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=81480"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}