{"id":81464,"date":"2018-11-03T22:43:14","date_gmt":"2018-11-03T19:43:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=81464"},"modified":"2018-11-03T22:43:42","modified_gmt":"2018-11-03T19:43:42","slug":"aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi\/","title":{"rendered":"(Turkish) Ayd\u0131n&#8217;da Jeotermal Enerji Santraline Tepki Y\u00fcr\u00fcy\u00fc\u015f\u00fc Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/81464\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ayd\u0131n B\u00fcy\u00fck\u015fehir Belediyesi \u00f6n\u00fcnde toplanan grup taraf\u0131ndan d\u00f6viz ve pankartlar ile Atat\u00fcrk Kent Meydan\u0131&#8217;na y\u00fcr\u00fcnd\u00fc.<img loading=\"lazy\" class=\"alignright wp-image-81465 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/11\/aydinda-jeotermal-enerji-santraline-tepki-yuruyusu-yapildi.jpg 590w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Grubu temsilen a\u00e7\u0131klamalarda bulunan Av. Ak\u0131n Yakan, K\u0131z\u0131lcak\u00f6y Mahallesi sakinlerinin jeotermal tesis istemedi\u011fini, bunun i\u00e7in protesto eylemi yapt\u0131klar\u0131n\u0131 dile getirdi.<\/p>\n<p>Kurulacak jeotermal tesisin 56 mw g\u00fcc\u00fcnde kurulmas\u0131n\u0131n planland\u0131\u011f\u0131n\u0131 belirten Yakan, &#8220;Yerle\u015fim yerine bu kadar yak\u0131n noktalarda santral kurulmas\u0131 a\u00e7\u0131k\u00e7a yasalara, t\u00fcm ulusal ve uluslararas\u0131 normlara ayk\u0131r\u0131d\u0131r. Santral kurulmak istenen alan birinci s\u0131n\u0131f tar\u0131m alan\u0131d\u0131r. Burada hi\u00e7bir \u015fekilde jeotermal santral yap\u0131lamaz.&#8221; ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ayd\u0131n B\u00fcy\u00fck\u015fehir Belediyesi \u00f6n\u00fcnde toplanan grup taraf\u0131ndan d\u00f6viz ve pankartlar ile Atat\u00fcrk Kent Meydan\u0131&#8217;na y\u00fcr\u00fcnd\u00fc. Grubu temsilen a\u00e7\u0131klamalarda bulunan Av. Ak\u0131n Yakan, K\u0131z\u0131lcak\u00f6y [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":81465,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,48],"tags":[40918,7179,40917,67,1009,16077,23226,34986,34985,36184,40919,40920,40916],"views":900,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81464"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=81464"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81464\/revisions"}],"predecessor-version":[{"id":81466,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81464\/revisions\/81466"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/81465"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=81464"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=81464"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=81464"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}