{"id":8126,"date":"2013-03-11T16:20:24","date_gmt":"2013-03-11T13:20:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=8126"},"modified":"2013-03-12T01:02:08","modified_gmt":"2013-03-11T22:02:08","slug":"sanayi-de-enerji-verimliligi-calismalari-sadece-elektrikle-sinirli-kalmayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sanayi-de-enerji-verimliligi-calismalari-sadece-elektrikle-sinirli-kalmayacak\/","title":{"rendered":"(Turkish) Enerji Verimlili\u011fi \u00c7al\u0131\u015fmalar\u0131 Elektrikle S\u0131n\u0131rl\u0131 Kalmayacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/8126\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji Verimlili\u011fi Derne\u011fi, s\u00fct ve meyve suyu fabrikalar\u0131na at\u0131k sular\u0131ndan para kazand\u0131racak bir geri d\u00f6n\u00fc\u015f\u00fcm projesi modeli sunmaya haz\u0131rlan\u0131yor.Enerji Verimlili\u011fi Derne\u011fi Genel Ba\u015fkan\u0131 \u0130brahim \u00c7a\u011flar, enerji verimlili\u011fi \u00e7al\u0131\u015fmalar\u0131n\u0131n sadece elektrikle s\u0131n\u0131rl\u0131 kalmayaca\u011f\u0131n\u0131 belirtti. Sanayi alan\u0131nda da \u00e7al\u0131\u015fmalar\u0131 bulundu\u011funu anlatan \u00c7a\u011flar \u015funlar\u0131 s\u00f6yledi:<\/strong><\/p>\n<p>\u201cMesela s\u00fct, meyve suyu \u00fcreten fabrikalar at\u0131klar\u0131n\u0131 bo\u015falt\u0131rlar ve at\u0131k paras\u0131 da \u00f6derler. \u015eimdi bir fabrika s\u0131v\u0131 at\u0131\u011f\u0131n tamam\u0131n\u0131 geri d\u00f6n\u00fc\u015f\u00fcmle tekrar kullanabiliyor, yani s\u0131f\u0131r at\u0131\u011fa d\u00f6n\u00fc\u015ft\u00fcr\u00fcyor. Ve i\u015fletme yapt\u0131\u011f\u0131 yat\u0131r\u0131m\u0131 da yakla\u015f\u0131k 4-4.5 y\u0131lda geri al\u0131yor. Ve ondan sonras\u0131 hep k\u00e2r oluyor. Ortalama bir fabrikan\u0131n yapaca\u011f\u0131 yat\u0131r\u0131m\u0131, 10 milyon dolar derseniz, fabrika bu 10 milyon dolarl\u0131k yat\u0131r\u0131m\u0131 4 y\u0131lda amorti ediyor. Ondan sonra da her y\u0131l 2.5 milyon dolar kazan\u0131yor.\u201d<\/p>\n<p><img loading=\"lazy\" class=\"alignright size-full wp-image-8127\" title=\"enver-dernegi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/enver-dernegi.jpg\" alt=\"\" width=\"300\" height=\"229\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/enver-dernegi.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/03\/enver-dernegi-65x50.jpg 65w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>S\u00f6z konusu modeli geli\u015ftiren fabrikalar\u0131n sahibiyle g\u00f6r\u00fc\u015ft\u00fcklerini kaydeden \u00c7a\u011flar, \u201cBu benim bir rekabet avantaj\u0131md\u0131r diye bakm\u0131yor sanayici. Bu know how`u kendisiyle ayn\u0131 i\u015fi yapan b\u00fct\u00fcn kurulu\u015flara \u00f6neriyor. Biz de bu modeli alaca\u011f\u0131z ve sanayiciye tan\u0131taca\u011f\u0131z. Modeli geli\u015ftiren i\u015fletmenin de reklam\u0131n\u0131 yapar\u0131z\u201d dedi.<\/p>\n<p><strong>\u00c7\u0130MENTOCUYA ATIK ISIDAN YILDA 350 M\u0130LYON TL<\/strong><\/p>\n<p>\u0130brahim \u00c7a\u011flar, sanayide verimlilik i\u00e7in verimsiz pompalama sistemlerinin yenilenmesi ve at\u0131k \u0131s\u0131dan elektrik \u00fcretiminin de \u00f6nemli kalemler oldu\u011funu anlatt\u0131. \u00c7a\u011flar\u2019\u0131n verdi\u011fi bilgiye g\u00f6re yap\u0131lan hesaplamalar at\u0131k \u0131s\u0131dan elektrik \u00fcretilmesi yoluyla sadece \u00e7imento sekt\u00f6r\u00fcnde y\u0131lda 350 milyon TL ek gelir elde edilebilece\u011fini ortaya koydu. Bu yat\u0131r\u0131mlar\u0131n geri d\u00f6n\u00fc\u015f s\u00fcresi ise yakla\u015f\u0131k 5-6 y\u0131l. Verim art\u0131\u015f\u0131 i\u00e7in pompalar\u0131n de\u011fi\u015ftirilmesine y\u00f6nelik yat\u0131r\u0131mlar\u0131n amortisman s\u00fcresi ise 2-2,5 y\u0131l olarak hesaplan\u0131yor.<\/p>\n<p><strong>KOB\u0130\u2019LERE GER\u0130 D\u00d6N\u00dc\u015e\u00dcM DESTE\u011e\u0130<\/strong><\/p>\n<p>\u00d6zellikle orta \u00f6l\u00e7ekli sanayilerde sanayicilerin bu tasarruflar i\u00e7in yap\u0131lacak yat\u0131r\u0131ma ay\u0131racak b\u00fct\u00e7eleri olmad\u0131\u011f\u0131n\u0131 anlatan \u0130brahim \u00c7a\u011flar \u015f\u00f6yle konu\u015ftu: \u201c10 makineli bir konfeksiyon at\u00f6lyesi d\u00fc\u015f\u00fcn\u00fcn yada 5 makineli bir plastik at\u00f6lyesi d\u00fc\u015f\u00fcn\u00fcn zaten bunlar\u0131n kazan\u00e7lar\u0131 belli ama t\u00fcketecekleri enerji y\u00fcksek. Biz dernek olarak bunlar\u0131n da \u00f6n\u00fcn\u00fc a\u00e7aca\u011f\u0131z. Yapaca\u011f\u0131 yat\u0131r\u0131m\u0131n kendine ne kadar s\u00fcrede geri d\u00f6nece\u011fini modelleyip ortaya koyaca\u011f\u0131z. Daha sonra finansman noktas\u0131nda da yard\u0131mc\u0131 olup yat\u0131r\u0131ma y\u00f6nlendirece\u011fiz.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/meyve-suyu-fabrikalarina-k\u00e2rli-geri-donusum-projes_2654.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji Verimlili\u011fi Derne\u011fi, s\u00fct ve meyve suyu fabrikalar\u0131na at\u0131k sular\u0131ndan para kazand\u0131racak bir geri d\u00f6n\u00fc\u015f\u00fcm projesi modeli sunmaya haz\u0131rlan\u0131yor.Enerji Verimlili\u011fi Derne\u011fi Genel Ba\u015fkan\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":8133,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,52],"tags":[3359,19,67,103,12,1525,800,2825,1902,793],"views":874,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8126"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=8126"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8126\/revisions"}],"predecessor-version":[{"id":8136,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/8126\/revisions\/8136"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/8133"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=8126"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=8126"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=8126"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}