{"id":81193,"date":"2018-10-29T17:21:59","date_gmt":"2018-10-29T14:21:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=81193"},"modified":"2018-10-29T17:22:27","modified_gmt":"2018-10-29T14:22:27","slug":"kutahyanin-gunes-santralleri-ges-cw-enerjiden","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kutahyanin-gunes-santralleri-ges-cw-enerjiden\/","title":{"rendered":"(Turkish) K\u00fctahya&#8217;n\u0131n G\u00fcne\u015f Santralleri ( GES ) CW Enerji\u2019den&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/81193\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Antalya Organize Sanayi B\u00f6lgesi&#8217;nde faaliyet g\u00f6steren CW Enerji, K\u00fctahya ili Tav\u015fanl\u0131 il\u00e7esinde in\u015fa edilen toplam 3,7 megavat kurulu g\u00fcce sahip, BSN 4 \u00d6kden Pazaryeri G\u00fcne\u015f Enerjisi Santralinin (GES) ge\u00e7ici kabul\u00fcn\u00fc tamamlad\u0131.<\/strong><\/p>\n<p>CW Enerji, 02.10.2013 tarihli 28783 say\u0131l\u0131 Elektrik Piyasas\u0131nda Lisanss\u0131z Elektrik \u00dcretim Y\u00f6netmeli\u011fine uygun olarak, Batman ili Kozluk il\u00e7esi 3.757 kWp (Kilowatt-Peak) g\u00fcc\u00fcnde arazi tipi g\u00fcne\u015f enerji <img loading=\"lazy\" class=\"alignleft wp-image-81194 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden-300x169.jpg\" alt=\"kutahyanin-gunes-santralleri-ges-cw-enerjiden\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/kutahyanin-gunes-santralleri-ges-cw-enerjiden.jpg 868w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>santralinin kurulumunu tamamlad\u0131. 3.757 kWp g\u00fcc\u00fcndeki GES projesinde CW Enerji taraf\u0131ndan ger\u00e7ekle\u015ftirilen 13 bin 662 adet CWT 275-60P marka model g\u00fcne\u015f paneli, 75 adet HUAWEI SUN2000-36KTL invert\u00f6r kullan\u0131ld\u0131. \u00a0CW Enerji\u2019nin y\u00fcklenici firma olarak, panel tedariki, m\u00fchendislik ve EPC (uygulama) ger\u00e7ekle\u015ftirdi\u011fi bu GES projesi 47 g\u00fcnde tamamlanm\u0131\u015ft\u0131r. S\u00f6z konusu projenin 16 Ekim 2018 tarihinde ge\u00e7ici kabul\u00fc al\u0131nm\u0131\u015f olup, i\u015fletmeye haz\u0131r hale getirilmi\u015ftir.<\/p>\n<p>Tamamlanan proje, 3.757 kWp kapasitelik kurulumu ile y\u0131lda ortalama 3 bin 237 hanenin elektri\u011fi yenilenebilir enerji ile kar\u015f\u0131layabilecek ve y\u0131lda ortalama 4303 ton CO2, 12,9 ton SO2 ve 4,81 ton NOx gaz\u0131 emisyonunun azalt\u0131m\u0131na destek verecek. 3.757 kWp g\u00fcc\u00fcndeki g\u00fcne\u015f enerjisi santralinde g\u00fcnde ortalama 15.954 kWp, y\u0131lda ortalama 5.823.035 kWp g\u00fcc\u00fcnde elektrik enerjisi \u00fcretilmesi planlan\u0131yor.<\/p>\n<p>CW Enerji\u2019nin Y\u00f6netim Kurulu Ba\u015fkan\u0131 Tar\u0131k Sarvan, K\u00fctahya ilini \u00e7evre dostu, temiz enerji kayna\u011f\u0131 g\u00fcne\u015f enerjisi ile bulu\u015fturmaktan gurur duyduklar\u0131n\u0131 belirterek, \u015funlar\u0131 s\u00f6yledi:<\/p>\n<p>\u201cDaha \u00f6nce yine K\u00fctahya\u2019n\u0131n Tav\u015fanl\u0131 il\u00e7esinde bir fabrikan\u0131n \u00e7at\u0131s\u0131na 1,1 megavat kurulu g\u00fcce sahip g\u00fcne\u015f enerji santralinin kurulumunu ger\u00e7ekle\u015ftirerek, anahtar teslimini ger\u00e7ekle\u015ftirmi\u015ftik. \u00dclkemizin d\u00f6rt bir noktas\u0131nda arazilere, end\u00fcstriyel \u00e7at\u0131lara, ev \u00e7at\u0131lar\u0131na kurulumunu ger\u00e7ekle\u015ftirdi\u011fimiz g\u00fcne\u015f enerji santrali projelerimiz devam ediyor. \u00dclkemizin g\u00fcne\u015f enerji potansiyelinin daha verimli bir \u015fekilde kullan\u0131lmas\u0131 i\u00e7in g\u00fcne\u015f enerji sekt\u00f6r\u00fcne ciddi yat\u0131r\u0131m hamleleri ger\u00e7ekle\u015ftiriyoruz. Ot bitmeyen, tar\u0131ma elveri\u015fsiz oldu\u011funa dair tespit raporu al\u0131nan \u00e7orak arazilerimizi g\u00fcne\u015f tarlalar\u0131yla de\u011ferlendirelim istiyoruz. Fabrikalar\u0131n, end\u00fcstriyel enerji t\u00fcketicilerinin, so\u011fuk hava depolar\u0131n\u0131n, \u00f6zel okullar\u0131n, hastanelerin, kamu kurumlar\u0131n\u0131n, \u00f6zel i\u015fletmelerin, petrol istasyonlar\u0131n\u0131n, seralar\u0131n \u00e7at\u0131lar\u0131na \u00f6z t\u00fcketim modeli g\u00fcne\u015f enerji santralleri kural\u0131m istiyoruz. M\u00fcstakil evlerin \u00e7at\u0131lar\u0131 g\u00fcne\u015f enerji panelleri ile dolsun istiyoruz. Enerjimizi \u00fccretsiz, \u00e7evre dostu, temiz enerji kayna\u011f\u0131 g\u00fcne\u015ften alal\u0131m, \u00fclke ekonomisine katk\u0131 sa\u011flayal\u0131m istiyoruz.<\/p>\n<p>Y\u00fczde 100 yenilenebilir enerjiye dayal\u0131 g\u00fcne\u015f PV k\u00fcresel elektrik sisteminin bataryalar sayesinde t\u00fcm y\u0131l boyunca ve her saatte uygulanabilirli\u011fi m\u00fcmk\u00fcnd\u00fcr ve b\u00fcy\u00fck oranda fosil yak\u0131tlar ve n\u00fckleer enerjiye dayal\u0131 mevcut sistemden daha uygun maliyetlidir. Bu nedenle 5-6 y\u0131l \u00f6ncesine kadar enerji \u00fcretiminde g\u00fcne\u015f enerji santrallerinin kullan\u0131lmas\u0131 bir tercih meselesi iken \u015fuanda bir zorunluluk haline gelmi\u015ftir. Art\u0131k sadece T\u00fcrkiye&#8217;de de\u011fil, d\u00fcnyadaki t\u00fcm geli\u015fmi\u015f ve geli\u015fmekte olan \u00fclkeler elektrik \u00fcretiminde g\u00fcne\u015f enerjisine ge\u00e7i\u015f yapmak zorundad\u0131r. Elektrik Odalar\u0131, \u0130n\u015faat Odalar\u0131 ile i\u015fbirli\u011fi yap\u0131larak bundan sonra yap\u0131lacak olan evlerin sadece tek e\u011fimli, \u2018g\u00fcney\u2019 e\u011fimli olarak in\u015fa edilmesi gerekir. O g\u00fcney e\u011fime de hem g\u00fcne\u015f panelinin hem de g\u00fcn \u0131s\u0131s\u0131n\u0131n yerle\u015ftirilece\u011fi d\u00fczene\u011fin kurulmas\u0131 \u00e7ok daha mant\u0131kl\u0131 olur. Bu \u015fekilde g\u00fcne\u015f enerjisi kullan\u0131m\u0131 artt\u0131r\u0131labilir.\u201d<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Antalya Organize Sanayi B\u00f6lgesi&#8217;nde faaliyet g\u00f6steren CW Enerji, K\u00fctahya ili Tav\u015fanl\u0131 il\u00e7esinde in\u015fa edilen toplam 3,7 megavat kurulu g\u00fcce sahip, BSN 4 \u00d6kden [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":81194,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[29014,40730,40729,608,34868,40731,67,1009,34990,2326,35038,7440,23416,2569,35039,23133,23131,40732,2190,2282,40728,34869,2722,34977,2918,40727,26829],"views":961,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81193"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=81193"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81193\/revisions"}],"predecessor-version":[{"id":81196,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/81193\/revisions\/81196"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/81194"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=81193"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=81193"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=81193"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}