{"id":80599,"date":"2018-10-18T13:00:04","date_gmt":"2018-10-18T10:00:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=80599"},"modified":"2018-10-18T13:04:15","modified_gmt":"2018-10-18T10:04:15","slug":"zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi\/","title":{"rendered":"(Turkish) Zorlu Enerji, Katar&#8217;\u0131n GES \u0130halesi \u0130\u00e7in \u00d6n Yeterlilik S\u00fcrecini Tamamlad\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/80599\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Zorlu Enerji Elektrik\u2019in lider ortak konumunda bulundu\u011fu konsorsiyum, Katar Genel Elektrik ve Su Kurumu\u2019nun a\u00e7t\u0131\u011f\u0131 G\u00fcne\u015f Enerji Santrali (GES) ihalesinde \u00f6n yeterlilik s\u00fcrecini tamamlad\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-80600\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/zorlu-enerji-katarin-ges-ihalesine-yonelik-on-yeterlilik-surecini-tamamladi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Zorlu Enerji, KAP\u2019a yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, ilk eleme s\u00fcrecinde, Zorlu Enerji Elektrik\u2019in yer ald\u0131\u011f\u0131 konsorsiyumun \u00f6n yeterlilik s\u00fcrecini ge\u00e7en 16 grup aras\u0131nda bulundu\u011fu belirtildi.<\/p>\n<p>Yap\u0131lan a\u00e7\u0131klamada; ihale, her bir fazda en az 350 MW olmak \u00fczere iki fazda en az 700 MW toplam kurulu g\u00fcce sahip olup g\u00fcne\u015f enerji santraline y\u00f6nelik proje geli\u015ftirilmesi, finansman sa\u011flanmas\u0131, santralin tasar\u0131m\u0131, in\u015faat\u0131, i\u015fletmesi ve bak\u0131m\u0131 ile m\u00fclkiyet hakk\u0131na sahip olunmas\u0131n\u0131 i\u00e7ermektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Zorlu Enerji Elektrik\u2019in lider ortak konumunda bulundu\u011fu konsorsiyum, Katar Genel Elektrik ve Su Kurumu\u2019nun a\u00e7t\u0131\u011f\u0131 G\u00fcne\u015f Enerji Santrali (GES) ihalesinde \u00f6n yeterlilik s\u00fcrecini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":80600,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[67,1009,40296,35038,40293,23416,2569,23133,23131,2054,36108,5436,2016,40292,2690,40294,40295,40297,344,40291],"views":966,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80599"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=80599"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80599\/revisions"}],"predecessor-version":[{"id":80603,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80599\/revisions\/80603"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/80600"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=80599"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=80599"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=80599"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}