{"id":80493,"date":"2018-10-16T18:44:47","date_gmt":"2018-10-16T15:44:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=80493"},"modified":"2018-10-16T18:47:31","modified_gmt":"2018-10-16T15:47:31","slug":"totalden-ozbekistanda-gunes-enerjisi-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/totalden-ozbekistanda-gunes-enerjisi-santrali\/","title":{"rendered":"(Turkish) Total&#8217;den \u00d6zbekistan\u2019a G\u00fcne\u015f Enerjisi Santrali"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/80493\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Frans\u0131z enerji devi Total taraf\u0131ndan \u00d6zbekistan\u2019\u0131n kamu \u015firketi Uzbekenergo ile b\u00fcy\u00fck \u00e7apta g\u00fcne\u015f enerjisi tesisi kurulumu yap\u0131laca\u011f\u0131 a\u00e7\u0131klamas\u0131 yap\u0131ld\u0131. Kurulacak tesis Semerkant \u015fehrine kurulacak olup \u00d6zbekistan h\u00fck\u00fcmeti ise ge\u00e7ti\u011fimiz hafta Fransa Kalk\u0131nma Ajans\u0131 ile 1 milyar euro\u2019luk bir yat\u0131r\u0131m anla\u015fmas\u0131 imzalad\u0131\u011f\u0131n\u0131 duyurmu\u015ftu.<img loading=\"lazy\" class=\"alignright wp-image-80494 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/totalden-ozbekistanda-gunes-enerjisi-santrali-300x154.jpg\" alt=\"\" width=\"300\" height=\"154\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/totalden-ozbekistanda-gunes-enerjisi-santrali-300x154.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/totalden-ozbekistanda-gunes-enerjisi-santrali-500x257.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/totalden-ozbekistanda-gunes-enerjisi-santrali-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/totalden-ozbekistanda-gunes-enerjisi-santrali.jpg 682w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Total ile yap\u0131lan anla\u015fmayla \u00d6zbekistan\u2019da y\u0131llarca yap\u0131lmas\u0131 planlanan g\u00fcne\u015f enerjisi tesisinin de hayata ge\u00e7mesi sa\u011flanacakt\u0131r. 100 MW g\u00fcc\u00fcnde bir enerji tesisi kurmay\u0131 planlayan \u00c7inli \u015firket Syngyes de ge\u00e7en g\u00fcnlerde projenin durduruldu\u011funa y\u00f6nelik bir a\u00e7\u0131klama yapm\u0131\u015ft\u0131.<\/p>\n<p>Fransa\u2019n\u0131n ba\u015fkenti Paris\u2019te Fransa Cumhurba\u015fkan\u0131 Emmanuel Macron ile biraraya gelinerek yap\u0131lan anla\u015fma sonucunda Total ba\u015fta olmak \u00fczere Frans\u0131z \u015firketlerinin \u00d6zbekistan\u2019daki faaliyetlerinin artmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Cansu K\u00f6stel \u2013 Enerji Sistemleri M\u00fchendisi \u2013 cansu.kostel@gmail.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Frans\u0131z enerji devi Total taraf\u0131ndan \u00d6zbekistan\u2019\u0131n kamu \u015firketi Uzbekenergo ile b\u00fcy\u00fck \u00e7apta g\u00fcne\u015f enerjisi tesisi kurulumu yap\u0131laca\u011f\u0131 a\u00e7\u0131klamas\u0131 yap\u0131ld\u0131. Kurulacak tesis Semerkant \u015fehrine [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":80494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[67,1009,2326,21886,23416,2569,21768,23133,23131,10997,1847],"views":1096,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80493"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=80493"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80493\/revisions"}],"predecessor-version":[{"id":80497,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80493\/revisions\/80497"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/80494"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=80493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=80493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=80493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}