{"id":80476,"date":"2018-10-16T12:23:15","date_gmt":"2018-10-16T09:23:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=80476"},"modified":"2018-10-16T12:23:15","modified_gmt":"2018-10-16T09:23:15","slug":"dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti\/","title":{"rendered":"(Turkish) D\u00fcnyan\u0131n 3.\u00fcnc\u00fc En Y\u00fcksek Baraj\u0131 Yusufeli Baraj\u0131\u2019nda Y\u00fczde 60\u2019l\u0131k K\u0131s\u0131m Bitti"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/80476\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Artvin\u2019in Yusufeli il\u00e7esinde \u00e7ift e\u011frilikli beton kemer kategorisinde T\u00fcrkiye\u2019nin en y\u00fcksek, d\u00fcnyan\u0131n ise \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 konumundaki Yusufeli Baraj\u0131 in\u015faat\u0131n\u0131n y\u00fczde 60\u2019\u0131 tamamland\u0131.<\/strong><span id=\"more-102429\"><\/span><\/p>\n<p>Artvin\u2019in 70 km g\u00fcney bat\u0131s\u0131nda \u00c7oruh Nehri \u00fczerinde yer alan ve temelden y\u00fcksekli\u011fi 275 metre ile \u00e7ift<img loading=\"lazy\" class=\"alignright wp-image-80477 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/dunyanin-3-uncu-en-yuksek-baraji-yusufeli-barajinda-yuzde-60lik-kisim-bitti.jpg 720w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/> e\u011frilikli beton kemer kategorisinde T\u00fcrkiye\u2019nin birinci, d\u00fcnyan\u0131n ise \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 olacak Yusufeli Baraj\u0131\u2019n\u0131n yap\u0131m\u0131 devam ediyor. Kurulu g\u00fcc\u00fc 558 MW, y\u0131ll\u0131k enerji \u00fcretimi 1 milyar 888 milyon kWh\/y\u0131l olacak baraj\u0131n tamamlanmas\u0131 ile y\u0131ll\u0131k yakla\u015f\u0131k 600 milyon TL milli b\u00fct\u00e7eye katk\u0131 sa\u011flanacak.<\/p>\n<p>30 Mart 2018 tarihinde ise ikmal ihalesi yap\u0131lan Yusufeli Baraj\u0131 ve HES projesinde in\u015faat \u00e7al\u0131\u015fmalar\u0131na 20 Nisan 2018 tarihinde ba\u015flan\u0131rken s\u00f6zle\u015fmeye g\u00f6re i\u015f bitim tarihinin ise 4 Nisan 2021 oldu\u011fu dile getirildi. Yusufeli Baraj\u0131 ve HES in\u015faat\u0131nda ge\u00e7ici ba\u011flant\u0131 yollar\u0131, baraj ula\u015f\u0131m yollar\u0131 tamamlan\u0131rken, 1 Nisan 2014&#8217;te \u00c7oruh Nehrinin derivasyonu ger\u00e7ekle\u015ftirilmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Artvin\u2019in Yusufeli il\u00e7esinde \u00e7ift e\u011frilikli beton kemer kategorisinde T\u00fcrkiye\u2019nin en y\u00fcksek, d\u00fcnyan\u0131n ise \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 konumundaki Yusufeli Baraj\u0131 in\u015faat\u0131n\u0131n y\u00fczde 60\u2019\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":80477,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1089,67,1009,34926,6979,1090,26829,1088,40186],"views":1215,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80476"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=80476"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80476\/revisions"}],"predecessor-version":[{"id":80478,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/80476\/revisions\/80478"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/80477"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=80476"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=80476"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=80476"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}