{"id":79842,"date":"2018-10-04T10:27:43","date_gmt":"2018-10-04T07:27:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=79842"},"modified":"2018-10-04T10:27:43","modified_gmt":"2018-10-04T07:27:43","slug":"norvecin-enerji-devi-equinora-turk-yonetici","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/norvecin-enerji-devi-equinora-turk-yonetici\/","title":{"rendered":"(Turkish) Norve\u00e7&#8217;in Enerji Devi Equinor&#8217;a T\u00fcrk Y\u00f6netici!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/79842\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkAk\u0131m Boru Hatt\u0131 Projesi Kamu \u0130li\u015fkileri Koordinat\u00f6r\u00fc Dr. Cenk Pala, Norve\u00e7&#8217;in enerji \u015firketi Equinor&#8217;un, T\u00fcrkiye Operasyonlar\u0131ndan Sorumlu Ba\u015fkan Yard\u0131mc\u0131s\u0131 oldu.<\/strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-79843\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/equinor-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/equinor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/equinor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/equinor-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/equinor.jpg 750w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>\u015eirketten\u00a0yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, Dr. Pala, T\u00fcrkiye&#8217;deki yat\u0131r\u0131mlar\u0131n\u0131 h\u0131zland\u0131rmaya haz\u0131rlanan Norve\u00e7li\u00a0Equinor&#8217;un, T\u00fcrkiye&#8217;deki i\u015f geli\u015ftirme stratejileri ve yat\u0131r\u0131m s\u00fcre\u00e7lerine rehberlik edecek.<\/p>\n<p>Halen Trakya b\u00f6lgesindeki iki sahada lisans \u00fczerinden ortakl\u0131\u011f\u0131 bulunan Equinor&#8217;un, bu sahalarda yapaca\u011f\u0131 sondaj ve \u00fcretim gibi \u00e7al\u0131\u015fmalarla do\u011fru orant\u0131l\u0131 olarak meydana gelebilecek geni\u015flemeleri, T\u00fcrkiye Operasyonlar\u0131ndan Sorumlu Ba\u015fkan Yard\u0131mc\u0131s\u0131 Dr. Pala y\u00f6netecek.<\/p>\n<p>Equinor&#8217;un Trakya&#8217;daki Yamal\u0131k-1 ve Banarl\u0131 sahalar\u0131nda 2017 y\u0131l\u0131nda sondajlar ger\u00e7ekle\u015ftirdi. Sondajlar s\u0131ras\u0131nda miktar\u0131 a\u00e7\u0131klanmayan oranda do\u011falgaz ve kondensat ke\u015ffedilirken, s\u00f6z konusu bulgularla ilgili testler devam ediyor.<\/p>\n<p>Uluslararas\u0131 arenada do\u011falgaz, petrol ve yenilenebilir enerji alanlar\u0131nda b\u00fcy\u00fcmeye devam eden Norve\u00e7li \u015firket, bu y\u0131l\u0131n may\u0131s ay\u0131nda Statoil olan ismini Equinor olarak de\u011fi\u015ftirmi\u015fti.<\/p>\n<p>Hisselerinin y\u00fczde 67&#8217;si Norve\u00e7\u00a0h\u00fck\u00fcmetinin elinde bulunan \u015firketin, geriye kalan y\u00fczde 33&#8217;l\u00fck hisseleri halka a\u00e7\u0131k olarak i\u015flem g\u00f6r\u00fcyor.<\/p>\n<p>Cansu K\u00f6stel &#8211; Enerji Sistemleri M\u00fchendisi &#8211; cansu.kostel@gmail.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkAk\u0131m Boru Hatt\u0131 Projesi Kamu \u0130li\u015fkileri Koordinat\u00f6r\u00fc Dr. Cenk Pala, Norve\u00e7&#8217;in enerji \u015firketi Equinor&#8217;un, T\u00fcrkiye Operasyonlar\u0131ndan Sorumlu Ba\u015fkan Yard\u0131mc\u0131s\u0131 oldu. \u015eirketten\u00a0yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":79843,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[39858,92,39854,67,1009,39855,39856,2045,6585,39853,39857],"views":1147,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79842"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=79842"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79842\/revisions"}],"predecessor-version":[{"id":79844,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79842\/revisions\/79844"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/79843"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=79842"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=79842"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=79842"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}