{"id":79753,"date":"2018-10-03T10:22:45","date_gmt":"2018-10-03T07:22:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=79753"},"modified":"2018-10-03T11:13:49","modified_gmt":"2018-10-03T08:13:49","slug":"iran-suriyede-termik-santral-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/iran-suriyede-termik-santral-kuracak\/","title":{"rendered":"(Turkish) \u0130ran, Suriye&#8217;de Termik Santral Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/79753\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<h2><strong>\u0130ran Enerji Bakan\u0131 R\u0131za Erdekaniyan, \u00fclkesi ile Suriye aras\u0131nda Suriye&#8217;nin Lazkiye kentinde 540 megavatl\u0131k termik santral kurulmas\u0131 anla\u015fmas\u0131 imzaland\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<img loading=\"lazy\" class=\"alignright  wp-image-79754\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/iransuiyetermiksantal-300x168.jpg\" alt=\"\" width=\"311\" height=\"174\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/iransuiyetermiksantal-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/iransuiyetermiksantal-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/iransuiyetermiksantal-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/10\/iransuiyetermiksantal.jpg 649w\" sizes=\"(max-width: 311px) 100vw, 311px\" \/><\/strong><\/h2>\n<p>\u0130ranl\u0131 \u0130\u015f\u00e7iler Haber Ajans\u0131&#8217;na (ILNA) konu\u015fan Erdekaniyan, \u00fclkesi ile Suriye aras\u0131nda, Lazkiye kentinde 411 milyon avro de\u011ferinde yat\u0131r\u0131mla 540 megavatl\u0131k termik santral kurulmas\u0131 anla\u015fmas\u0131 imzaland\u0131\u011f\u0131n\u0131 kaydetti.<\/p>\n<p>Bakan Erdekaniyan, anla\u015fmay\u0131 \u0130ran taraf\u0131ndan Elektrik \u00dcretim Kurumu Genel M\u00fcd\u00fcr\u00fc Mahmud Ramazan ile m\u00fchendislik \u015firketi Mapna Grup Genel M\u00fcd\u00fcr\u00fc Abbas Ali Abadi&#8217;nin, Suriye taraf\u0131ndan da Elektrik Bakan\u0131 Muhammed Zuheyr Harputli&#8217;nin imzalad\u0131\u011f\u0131n\u0131 belirtti.<\/p>\n<p>\u0130ran merkezli Mapna Grup&#8217;un Suriye&#8217;de bug\u00fcne kadar 900 megavatl\u0131k termik santral kurdu\u011funu dile getiren Erdekaniyan, yak\u0131n gelecekte Halep kentinde 125 megavatl\u0131k termik santralin faaliyete ge\u00e7ece\u011fini aktard\u0131.<\/p>\n<p>Cansu K\u00f6stel \u2013 Enerji Sistemleri M\u00fchendisi \u2013 cansu.kostel@gmail.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. \u0130ran Enerji Bakan\u0131 R\u0131za Erdekaniyan, \u00fclkesi ile Suriye aras\u0131nda Suriye&#8217;nin Lazkiye kentinde 540 megavatl\u0131k termik santral kurulmas\u0131 anla\u015fmas\u0131 imzaland\u0131\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131. \u0130ranl\u0131 \u0130\u015f\u00e7iler [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":79754,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[39809,39806,67,1009,1333,39805,39804,39807,39808,39810,39803,4731,438],"views":689,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79753"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=79753"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79753\/revisions"}],"predecessor-version":[{"id":79756,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79753\/revisions\/79756"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/79754"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=79753"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=79753"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=79753"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}