{"id":79465,"date":"2018-09-29T19:21:43","date_gmt":"2018-09-29T16:21:43","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=79465"},"modified":"2018-09-29T21:49:00","modified_gmt":"2018-09-29T18:49:00","slug":"kilise-40-mwlik-lacivert-res-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kilise-40-mwlik-lacivert-res-kurulacak\/","title":{"rendered":"(Turkish) Kilis\u2019e 40 MW G\u00fcc\u00fcnde &#8216;Lacivert RES&#8217; Geliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/79465\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Lacivert Yenilenebilir Enerji, Kilis ilinde 40 MW kapasiteli Lacivert R\u00fczg\u00e2r Enerji Santrali kurup i\u015fletecek.<\/strong><\/p>\n<p>Lacivert Yenilenebilir Enerji Ve Elektrik \u00dcretim A\u015e taraf\u0131ndan Kilis ili, Merkez \u0130l\u00e7esi, Ba\u015fma\u011fra, <img loading=\"lazy\" class=\"alignright size-medium wp-image-79466\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/kilis-300x187.png\" alt=\"\" width=\"300\" height=\"187\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/kilis-300x187.png 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/kilis-500x311.png 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/kilis-80x50.png 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/kilis.png 630w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Kusk\u0131nk\u0131ran, Topda\u011f\u0131, Kuzuini, Tanbural\u0131, \u00c7ukuroba, Demirciler K\u00f6yleri ve Polateli \u0130l\u00e7esi, Yeniyurt K\u00f6y\u00fc s\u0131n\u0131rlar\u0131 i\u00e7erisinde 40 MW kapasiteli Lacivert R\u00fczg\u00e2r Enerji Santrali\u2019nin kurulmas\u0131 ve i\u015fletilmesi planlan\u0131yor.<\/p>\n<p>Lacivert R\u00fczg\u00e2r Enerji Santrali\u2019nde ilk 10 t\u00fcrbin 2 MW, geriye kalan 8 adet t\u00fcrbinin ise 2,5 MW olmak \u00fczere toplam 18 adet t\u00fcrbin kurulacak.<\/p>\n<p>Lacivert Yenilenebilir Enerji, T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) taraf\u0131ndan 2017 y\u0131l\u0131 Aral\u0131k ay\u0131nda Toplam 2130 MW\u2019 l\u0131k r\u00fczg\u00e2r enerji santrali kapasite tahsisi i\u00e7in a\u00e7\u0131lan ihaleler kapsam\u0131nda Gaziantep-Kilis&#8217;teki 40 MW&#8217; l\u0131k kapasitenin tamam\u0131n\u0131 -1,63 dolar cent\/kWh ile kazanm\u0131\u015ft\u0131.<\/p>\n<p>Hatice K\u00fcbra G\u00fcney \u2013 Elektrik Elektronik M\u00fchendisi \u2013 E-mail: kubraguney036@gmail.com<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Lacivert Yenilenebilir Enerji, Kilis ilinde 40 MW kapasiteli Lacivert R\u00fczg\u00e2r Enerji Santrali kurup i\u015fletecek. Lacivert Yenilenebilir Enerji Ve Elektrik \u00dcretim A\u015e taraf\u0131ndan Kilis [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":79466,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[67,1009,968,39665,35002,16,24949,35004,23318,34960,26829],"views":1374,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79465"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=79465"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79465\/revisions"}],"predecessor-version":[{"id":79498,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/79465\/revisions\/79498"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/79466"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=79465"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=79465"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=79465"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}