{"id":78813,"date":"2018-09-17T13:44:23","date_gmt":"2018-09-17T10:44:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78813"},"modified":"2018-09-17T13:57:42","modified_gmt":"2018-09-17T10:57:42","slug":"eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi\/","title":{"rendered":"(Turkish) ESHOT\u2019un G\u00fcne\u015f Santrali 1,5 Milyon kWh Enerji \u00dcretimi Ger\u00e7ekle\u015ftirdi"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78813\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Filosuna ilave etti\u011fi 20 elektrikli otob\u00fcs ile \u00e7evreci ula\u015f\u0131m ad\u0131na \u00f6nemli bir ad\u0131m atm\u0131\u015f olan \u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi ESHOT Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan kendi elektri\u011fini \u00fcretip b\u00fcy\u00fck tasarruf sa\u011flad\u0131.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft wp-image-78814 size-medium\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/eshotun-gunes-santrali-15-milyon-kwh-enerji-uretimi-gerceklestirdi.jpg 696w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Yeni otob\u00fcslere y\u00f6nelik gerekli elektri\u011fin tamam\u0131n\u0131 Gediz\u2019deki at\u00f6lyelerin \u00e7at\u0131lar\u0131na kurulan g\u00fcne\u015f enerjisi santrali ile kar\u015f\u0131layan ESHOT, 2017&#8217;nin A\u011fustos ay\u0131ndan g\u00fcn\u00fcm\u00fcze 1.5 milyon kWh enerji kar\u015f\u0131l\u0131\u011f\u0131nda yakla\u015f\u0131k 722 bin liral\u0131k tasarruf elde etti.<\/p>\n<p>1.38 MW santralde \u00fcretilen elektrik enerjisi ile 13 ayda toplam da 2 bin 559 ton karbondioksit sal\u0131m\u0131 engellenirken bu de\u011fer 64 bin 175 a\u011fac\u0131n bir g\u00fcnde filtreleyebilece\u011fi CO2 miktar\u0131na denk gelmektedir.<\/p>\n<p>ESHOT Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc, Adatepe ve \u00c7i\u011fli garajlar\u0131na kurulacak toplamda 2 MW g\u00fcce sahip g\u00fcne\u015f enerji santrallerinin fizibilite \u00e7al\u0131\u015fmalar\u0131n\u0131 da tamamlayarak y\u0131l sonuna kadar proje onaylar\u0131n\u0131 ve ihale haz\u0131rl\u0131klar\u0131na y\u00f6nelik \u00e7al\u0131\u015fmalar\u0131n\u0131 s\u00fcrd\u00fcr\u00fcrken bu yat\u0131r\u0131mlarla birlikte kurumsal olarak t\u00fcketilen elektrik enerjisinin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fc de g\u00fcne\u015ften kar\u015f\u0131lanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Filosuna ilave etti\u011fi 20 elektrikli otob\u00fcs ile \u00e7evreci ula\u015f\u0131m ad\u0131na \u00f6nemli bir ad\u0131m atm\u0131\u015f olan \u0130zmir B\u00fcy\u00fck\u015fehir Belediyesi ESHOT Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan kendi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78814,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[19,13859,67,1009,26148,39350,2326,23416,2569,23133,23131,10632],"views":867,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78813"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78813"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78813\/revisions"}],"predecessor-version":[{"id":78818,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78813\/revisions\/78818"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78814"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78813"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78813"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78813"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}