{"id":78703,"date":"2018-09-14T11:13:09","date_gmt":"2018-09-14T08:13:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78703"},"modified":"2018-09-14T11:23:32","modified_gmt":"2018-09-14T08:23:32","slug":"agriya-ruzgar-enerji-santrali-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/agriya-ruzgar-enerji-santrali-kurulacak\/","title":{"rendered":"(Turkish) A\u011fr\u0131\u2019ya R\u00fczgar Enerji Santrali Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78703\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kocatepe Arslanlar Elektrik \u015firketi A\u011fr\u0131\u2019n\u0131n Diyadin il\u00e7esinde 20 MW kapasiteli \u0130pektepe R\u00fczg\u00e2r Enerji Santrali (RES) kurup i\u015fletecek.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright wp-image-78707 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/indir-1.jpg\" alt=\"agriya-ruzgar-enerji-santrali\" width=\"298\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/indir-1.jpg 298w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/indir-1-80x45.jpg 80w\" sizes=\"(max-width: 298px) 100vw, 298px\" \/><\/p>\n<p>T\u00fcrkiye&#8217;de 2018 Haziran ay\u0131 sonu itibariyle i\u015fletmede olan r\u00fczg\u00e2r enerji santrallerinin toplam kurulu g\u00fcc\u00fc ise 6.671 MW\u2019d\u0131r. Haz\u0131rlanan R\u00fczg\u00e2r Enerjisi Potansiyel Atlas\u0131 (REPA) T\u00fcrkiye r\u00fczg\u00e2r enerjisi potansiyeli 48.000 MW olarak belirlenmi\u015ftir. Bu durumda r\u00fczgarda daha yolun ba\u015f\u0131nda oldu\u011fumuz s\u00f6ylenebilir. Genel olarak r\u00fczgar t\u00fcrbinlerinin \u00e7ok y\u00fcksek r\u00fczgar h\u0131zlar\u0131nda \u00e7al\u0131\u015f\u0131ld\u0131\u011f\u0131 d\u00fc\u015f\u00fcn\u00fclse de geli\u015fen teknoloji ve ula\u015f\u0131m ile r\u00fczgar olan her yere r\u00fczgar santrali kurulabiliyor.<\/p>\n<p>T\u00fcrkiye i\u00e7in bir \u00f6rnekte Kocatepe Arslanlar Elektrik \u015firketi A\u011fr\u0131\u2019n\u0131n Diyadin il\u00e7esinde 20 MW kapasiteli \u0130pektepe R\u00fczg\u00e2r Enerji Santrali kurup i\u015fletmesi oldu.\u00a0 20 milyon dolar yat\u0131r\u0131mla 954 hektarl\u0131k alanda kurulacak olan santralde her biri 1 MW kurulu g\u00fcc\u00fcndeki 20 r\u00fczgar t\u00fcrbini olacak. Bu santral y\u0131lda toplam 70.080.000 kWh elektrik \u00fcretecek. Kurulumu yakla\u015f\u0131k 30 ay s\u00fcrmesi beklenen santralin 49 y\u0131l boyunca elektrik \u00fcretece\u011fi a\u00e7\u0131kland\u0131.<\/p>\n<p>Selin Telci- Enerji Sistemleri M\u00fchendisi &#8211;\u00a0<a href=\"mailto:selintelci@hotmail.com\" target=\"_blank\" rel=\"noopener\">selintelci@hotmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kocatepe Arslanlar Elektrik \u015firketi A\u011fr\u0131\u2019n\u0131n Diyadin il\u00e7esinde 20 MW kapasiteli \u0130pektepe R\u00fczg\u00e2r Enerji Santrali (RES) kurup i\u015fletecek. T\u00fcrkiye&#8217;de 2018 Haziran ay\u0131 sonu itibariyle [&hellip;]<\/p>\n","protected":false},"author":6,"featured_media":78707,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[6358,19,67,1009,39276,39275,474,35002,24949,24301,23318,34960,324],"views":2330,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78703"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78703"}],"version-history":[{"count":5,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78703\/revisions"}],"predecessor-version":[{"id":78717,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78703\/revisions\/78717"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78707"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78703"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78703"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78703"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}