{"id":78578,"date":"2018-09-12T11:54:15","date_gmt":"2018-09-12T08:54:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78578"},"modified":"2018-09-12T11:54:15","modified_gmt":"2018-09-12T08:54:15","slug":"limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti\/","title":{"rendered":"(Turkish) L\u0130MAK Holding&#8217;in &#8216;L\u0130MGAZ Buharkent JES&#8217;i ( 13.8 MW )&#8217; \u00dcretime Ge\u00e7ti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78578\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>EGES\u0130M taraf\u0131ndan EPC olarak ba\u015far\u0131yla tamamlanan L\u0130MGAZ Buharkent Jeotermal Enerji Santrali 06.09.2018 tarihi itibariyle T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;nca kabulleri yap\u0131larak enerji \u00fcretimine ge\u00e7mi\u015ftir.<img loading=\"lazy\" class=\"alignright size-medium wp-image-78579\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti-300x300.jpg\" alt=\"\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti-300x300.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti-150x150.jpg 150w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti-400x400.jpg 400w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti-50x50.jpg 50w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/limak-holding-in-limgaz-buharkent-jes-i-13-8-mw-uretime-gecti.jpg 408w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Limak Holding alt\u0131nda faaliyet g\u00f6steren Limgaz Elektrik \u00dcretim Madencilik Sanayi Ve Ticaret A.\u015e. \u2018ye ait Ayd\u0131n ili, Buharkent \u0130l\u00e7esindeki Jeotermal sahada \u00a0EGES\u0130M taraf\u0131ndan anahtar teslimi ( EPC ) JES Projesi olarak tamamlanan 13.8 MW g\u00fcce sahip\u00a0<strong>L\u0130MGAZ Buharkent Jeotermal Enerji Santrali<\/strong> \u00a004.09.2018 tarihinde zaman\u0131nda senkron olup, 06.09.2018 tarihi itibariyle \u00a0T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;nca kabulleri yap\u0131larak enerji \u00fcretimine ba\u015flam\u0131\u015ft\u0131r.<\/p>\n<p>Ba\u015far\u0131yla devreye giren 28 Adet Jeotermal Enerji Santral yat\u0131r\u0131m\u0131na imza atan Egesim, Atlas Copco i\u015fbirli\u011fiyle anahtar teslimi ilk EPC (M\u00fchendislik \u2013 Tedarik \u2013 \u0130n\u015faat) \u00a0Projesi \u00a0\u2018L\u0130MGAZ Buharkent Jeotermal Enerji \u00a0Santrali\u2019ni de ba\u015far\u0131yla tamamlam\u0131\u015ft\u0131r.\u00a0 Santralin devreye al\u0131nmas\u0131 ile T\u00fcrkiye\u2019nin Jeotermal Enerji \u00dcretim Kapasitesi \u00a01.188,2 MW g\u00fcce de y\u00fckselmi\u015f oldu.<\/p>\n<p>13.8 MW kurulu g\u00fcc\u00fcndeki BUHARKENT JES\u2019in y\u0131lda 113 milyon kWh \u00fcretim yapmas\u0131 planlan\u0131yor.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.EGES\u0130M taraf\u0131ndan EPC olarak ba\u015far\u0131yla tamamlanan L\u0130MGAZ Buharkent Jeotermal Enerji Santrali 06.09.2018 tarihi itibariyle T.C. Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131&#8217;nca kabulleri yap\u0131larak enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78579,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[39220,39217,39219,67,1009,16077,23226,34985,36184,4797,39216,39218],"views":2404,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78578"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78578"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78578\/revisions"}],"predecessor-version":[{"id":78580,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78578\/revisions\/78580"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78579"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}