{"id":78565,"date":"2018-09-12T10:26:31","date_gmt":"2018-09-12T07:26:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78565"},"modified":"2018-09-12T10:26:56","modified_gmt":"2018-09-12T07:26:56","slug":"enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor\/","title":{"rendered":"(Turkish) Enerji \u015eirketleri Bankalar \u0130le Bor\u00e7lar\u0131n\u0131 Yeniden Yap\u0131land\u0131r\u0131yor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78565\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Boston Consulting Group ve T\u00dcS\u0130AD taraf\u0131ndan haz\u0131rlanan bir rapora g\u00f6re, son 15 y\u0131lda b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ucuz kredi ile finanse edilen toplam 95 milyar dolarl\u0131k yat\u0131r\u0131m T\u00fcrk elektrik piyasas\u0131na akt\u0131. Bunun yakla\u015f\u0131k 50 milyar dolarl\u0131k k\u0131sm\u0131 ise geri \u00f6denecek.\u00a0Enerji \u015firketleri\u00a0y\u00fczde 40 de\u011fer kaybeden lira nedeniyle bor\u00e7lar\u0131n\u0131 yeniden yap\u0131land\u0131rmaya ba\u015flad\u0131lar.<img loading=\"lazy\" class=\"alignright size-medium wp-image-78566\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/enerji-sirketleri-bankalar-ile-borclarini-yeniden-yapilandiriyor.jpg 879w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Gama Holding, T\u00fcrkiye genelinde yakla\u015f\u0131k 1,100 MW kurulu g\u00fcce sahip hidroelektrik, r\u00fczgar ve do\u011falgazdan elektrik \u00fcreten varl\u0131klar\u0131n\u0131n bir k\u0131sm\u0131na y\u00f6nelik sat\u0131\u015f g\u00f6r\u00fc\u015fmeleri yapan \u015firketler aras\u0131nda yer al\u0131rken ya\u015fanan finansman sorunlar\u0131, yenilenebilir enerji sekt\u00f6r\u00fc i\u00e7in bile T\u00fcrkiye\u2019nin enerji piyasas\u0131nda g\u00f6r\u00fcn\u00fcm\u00fc olumsuz y\u00f6nde etkilemektedir.<\/p>\n<p>Ge\u00e7en ay Fitch Ratings, k\u0131sa vadede daha az proje finansman\u0131 sa\u011flayabilecek olmalar\u0131 nedeniyle T\u00fcrk g\u00fcne\u015f ve r\u00fczgar kapasitesine y\u00f6nelik yak\u0131n d\u00f6nem tahminlerinde d\u00fc\u015f\u00fc\u015fe gitmi\u015fti.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Boston Consulting Group ve T\u00dcS\u0130AD taraf\u0131ndan haz\u0131rlanan bir rapora g\u00f6re, son 15 y\u0131lda b\u00fcy\u00fck \u00f6l\u00e7\u00fcde ucuz kredi ile finanse edilen toplam 95 milyar [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78566,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,47,50],"tags":[29522,6417,25274,39212,34979,19638,2873,26353,67,1009,2069,117,2818,1481,28896],"views":1153,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78565"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78565"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78565\/revisions"}],"predecessor-version":[{"id":78567,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78565\/revisions\/78567"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78566"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78565"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78565"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78565"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}