{"id":78549,"date":"2018-09-11T13:44:38","date_gmt":"2018-09-11T10:44:38","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78549"},"modified":"2018-09-11T14:14:14","modified_gmt":"2018-09-11T11:14:14","slug":"akkuyu-nukleer-santrali-projesine-yeni-sirket","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akkuyu-nukleer-santrali-projesine-yeni-sirket\/","title":{"rendered":"(Turkish) Akkuyu N\u00fckleer Santrali Projesine Yeni \u015eirket!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78549\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS&#8217;nin h\u00fck\u00fcmetler aras\u0131 anla\u015fmas\u0131 May\u0131s 2010&#8217;da T\u00fcrkiye ile Rusya aras\u0131nda imzaland\u0131. \u0130\u015fletme \u00f6mr\u00fc 60 y\u0131l olacak ve bin 200 megavatl\u0131k 4 \u00fcniteden meydana gelen santral, devreye girdi\u011finde y\u0131lda 35 milyar kilovatsaat elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-78550\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/akkuyu-nukleer-santrali-projesine-yeni-sirket-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/akkuyu-nukleer-santrali-projesine-yeni-sirket-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/akkuyu-nukleer-santrali-projesine-yeni-sirket-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/akkuyu-nukleer-santrali-projesine-yeni-sirket-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/akkuyu-nukleer-santrali-projesine-yeni-sirket.jpg 630w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Rusya devlet n\u00fckleer enerji kurumu Rosatom&#8217;dan, T\u00fcrkiye&#8217;nin ilk n\u00fckleer santrali Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali (NGS) Projesi&#8217;nin y\u00fcklenicileri aras\u0131na yeni bir \u015firket olan\u00a0Atomstroyexport A\u015e.&#8217;nin (ASE) kat\u0131ld\u0131\u011f\u0131 bildirildi. Kat\u0131lan \u015firket sekt\u00f6r\u00fcn \u00f6nde gelen \u015firketlerinden ve n\u00fckleer m\u00fchendislik alan\u0131nda d\u00fcnya lideri bir Rus \u015firketi konumunda yer almaktad\u0131r.<\/p>\n<p>Y\u00fcksek g\u00fcce sahip n\u00fckleer santrallerin, radyoaktif at\u0131k ve kullan\u0131lm\u0131\u015f n\u00fckleer yak\u0131tlar\u0131n y\u00f6netildi\u011fi tesislerin ve termik enerji tesislerinin tasar\u0131m\u0131 ve in\u015fas\u0131 projelerini ger\u00e7ekle\u015ftirmekte olup, her t\u00fcrl\u00fc komplike m\u00fchendislik tesisleri i\u00e7in tam kapsaml\u0131\u00a0hizmetler sunmaktad\u0131r.<\/p>\n<p>Atomstroyexport A\u015e&#8217;nin (ASE) n\u00fckleer g\u00fc\u00e7 santralinin in\u015faat s\u00fcre\u00e7lerini ve teknolojilerini tam olarak anlayarak\u00a0ve tecr\u00fcbeleriyle devam eden projeye dahil olmu\u015ftur&#8230;<\/p>\n<p>Cansu K\u00d6STEL \u2013 Enerji Sistemleri M\u00fchendisi \u2013\u00a0<a href=\"mailto:cansu.kostel@gmail.com\" target=\"_blank\" rel=\"noopener\">cansu.kostel@gmail.com<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin ilk n\u00fckleer g\u00fc\u00e7 santrali Akkuyu NGS&#8217;nin h\u00fck\u00fcmetler aras\u0131 anla\u015fmas\u0131 May\u0131s 2010&#8217;da T\u00fcrkiye ile Rusya aras\u0131nda imzaland\u0131. \u0130\u015fletme \u00f6mr\u00fc 60 y\u0131l olacak ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78550,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,1026,39117,67,1009,12235,36443,23134,25480,34930],"views":1513,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78549"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78549"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78549\/revisions"}],"predecessor-version":[{"id":78555,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78549\/revisions\/78555"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78550"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78549"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78549"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78549"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}