{"id":78391,"date":"2018-09-06T17:59:11","date_gmt":"2018-09-06T14:59:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78391"},"modified":"2018-09-06T17:59:43","modified_gmt":"2018-09-06T14:59:43","slug":"turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi\/","title":{"rendered":"(Turkish) T\u00fcrkerler&#8217;den Ala\u015fehir\u2019de 664 Milyon USD\u2019l\u0131k Jeotermal Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78391\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Manisa Ala\u015fehir\u2019e hali haz\u0131rda 336 milyon USD hacminde jeotermal enerji santrali yat\u0131r\u0131m\u0131 yapan T\u00fcrkerler Holding, yeni jeotermal enerji santralleri kurmaya haz\u0131rlan\u0131yor. Bu y\u0131l ilki d\u00fczenlenen Ala\u015fehir \u00dcz\u00fcm Festivali\u2019nde \u00f6d\u00fcl alan T\u00fcrkerler Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m T\u00fcrker,664 milyon USD\u2019lik yeni yat\u0131r\u0131m\u0131n yolda oldu\u011funu m\u00fcjdeledi.<\/strong><\/p>\n<p>Enerjiden sa\u011fl\u0131\u011fa; in\u015faattan do\u011falgaza kadar bir\u00e7ok farkl\u0131 sekt\u00f6rde faaliyet g\u00f6steren T\u00fcrkiye&#8217;nin \u00f6nde gelen k\u00f6kl\u00fc kurulu\u015flar\u0131ndan T\u00fcrkerler Holding, yat\u0131r\u0131mlar\u0131na h\u0131z kesmeden devam ediyor. Manisa\u2019da ilk <img loading=\"lazy\" class=\"alignright size-medium wp-image-78392\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/turkerlerden-alasehirde-664-milyon-usdlik-jeotermal-yatirimi.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>defa d\u00fczenlenen Ala\u015fehir \u00dcz\u00fcm Festivali\u2019nin ana sponsorlu\u011funu \u00fcstlenen T\u00fcrkerler Holding ad\u0131na Ala\u015fehir Kaymakam\u0131 Abdullah U\u00e7gun\u2019un elinden plaketini alan Y\u00f6netim Kurulu Ba\u015fkan\u0131 Kaz\u0131m T\u00fcrker, 664 milyon USD\u2019lik yat\u0131r\u0131m\u0131n yolda oldu\u011funu s\u00f6yledi.<\/p>\n<p><strong><em>664 milyon USD\u2019lik yat\u0131r\u0131m yolda <\/em><\/strong><\/p>\n<p>\u015eimdiye kadar Manisa Ala\u015fehir\u2019de, JES 1 ve JES 2 Jeotermal Santralleri ile toplamda 200 milyon USD de\u011ferinde yat\u0131r\u0131m yaparak 48 MW kurulu g\u00fc\u00e7 elde ettiklerini hat\u0131rlatan <strong>Kaz\u0131m T\u00fcrker<\/strong>, 30 MW kapasiteli JES 3 santralinin de in\u015faat\u0131n\u0131n devam etti\u011fini s\u00f6zlerine ekledi. <strong>Kaz\u0131m T\u00fcrker<\/strong> konu\u015fmas\u0131n\u0131 s\u00f6yle s\u00fcrd\u00fcrd\u00fc: \u201c<em>Ala\u015fehir&#8217;de kurdu\u011fumuz JES 1 ve JES 2 Jeotermal Enerji Santralleri ile toplamda 48 MW kurulu g\u00fcc\u00fcm\u00fcz var. Bu santrallerle y\u0131lda 360 milyon kWh enerji elde ediyoruz. Toplam 200 milyon USD\u2019lik yat\u0131r\u0131m bedeliyle hayata ge\u00e7irdi\u011fimiz bu santrallere ilaveten, 136 milyon USD de\u011ferinde y\u0131lda 220 milyon kWh enerji elde edebilece\u011fimiz JES 3 santralinin in\u015faat\u0131n\u0131 h\u0131z kesmeden s\u00fcrd\u00fcr\u00fcyoruz. T\u00fcm bu geli\u015fmelerin yan\u0131nda yeni yat\u0131r\u0131mlar\u0131 da hayata ge\u00e7irmeye devam edece\u011fiz. JES 3 santral\u0131 yap\u0131m\u0131ndan sonra, s\u0131ras\u0131yla JES 4, 5, 6, 7 ve 8 yat\u0131r\u0131mlar\u0131n\u0131 tamamlayarak toplam 248 MW kapasiteye ula\u015fmay\u0131 planl\u0131yoruz. Bu projelerin tamamlanmas\u0131yla y\u0131ll\u0131k \u00fcretim hacmi 1.8 milyon MWh\u2019ya ula\u015facak ve b\u00f6lge bir jeotermal enerji \u00fcss\u00fc haline gelecek. \u0130lave yat\u0131r\u0131mlar\u0131m\u0131zla birlikte b\u00f6lgeye toplamda 1 milyar USD de\u011ferinde katk\u0131 sa\u011flam\u0131\u015f olaca\u011f\u0131z.\u201d<\/em><\/p>\n<p>Kaz\u0131m T\u00fcrker, Manisa\u2019n\u0131n ve Ege B\u00f6lgesi\u2019nin T\u00fcrkerler i\u00e7in de\u011ferinin b\u00fcy\u00fck oldu\u011funu vurgulayarak hem festivalin hem de yeni yat\u0131r\u0131mlar\u0131n b\u00f6lge ve \u00fclke ekonomisine hay\u0131rl\u0131 olmas\u0131n\u0131 diledi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Manisa Ala\u015fehir\u2019e hali haz\u0131rda 336 milyon USD hacminde jeotermal enerji santrali yat\u0131r\u0131m\u0131 yapan T\u00fcrkerler Holding, yeni jeotermal enerji santralleri kurmaya haz\u0131rlan\u0131yor. Bu y\u0131l [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78392,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,48],"tags":[67,1009,16077,13090,23226,34985,30234,8638,6072,8637],"views":979,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78391"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78391"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78391\/revisions"}],"predecessor-version":[{"id":78393,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78391\/revisions\/78393"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78392"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78391"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78391"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78391"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}