{"id":78324,"date":"2018-09-05T11:53:45","date_gmt":"2018-09-05T08:53:45","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78324"},"modified":"2018-09-05T11:58:30","modified_gmt":"2018-09-05T08:58:30","slug":"yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek\/","title":{"rendered":"(Turkish) Y\u0131lda 250 Bin Ton At\u0131ktan 200 Milyon kW\/saat Elektrik \u00dcretimi Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78324\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Afyon\u2019da kurulumu yap\u0131lan 27 MWe kapasiteye sahip EBER Biyok\u00fctle Yakma Tesisi i\u00e7in Siemens SST-600 Buhar T\u00fcrbini tercih edildi. Tamamland\u0131\u011f\u0131nda T\u00fcrkiye\u2019nin ikinci en b\u00fcy\u00fck biyok\u00fctle tesisi olacak projesiyle y\u0131lda 250 bin tona yak\u0131n at\u0131k bertaraf edilirken, yakla\u015f\u0131k 200 milyon kW\/saat elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecek.<\/strong><\/p>\n<p>Siemens\u2019in yenilik\u00e7i \u2018Geli\u015fmi\u015f Platform\u2019 teknolojisine dayanan y\u00fcksek verimli ve g\u00fcvenilir SST-600 <img loading=\"lazy\" class=\"alignright size-medium wp-image-78325\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/yilda-250-bin-ton-atiktan-200-milyon-kw-saat-elektrik-uretilecek.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Buhar T\u00fcrbini, T\u00fcrkiye\u2019nin at\u0131k bertaraf\u0131na ve temiz enerji \u00fcretimine katk\u0131da bulunacak. Yap\u0131lan a\u00e7\u0131klada Afyon\u2019da in\u015faat\u0131 s\u00fcren ve tamamland\u0131\u011f\u0131nda 27 MWe kurulu g\u00fc\u00e7le hizmet sa\u011flayacak olan EBER Biyok\u00fctle Yakma Tesisi\u2019nde kullan\u0131lan Siemens SST-600 Buhar T\u00fcrbini, sa\u011flad\u0131\u011f\u0131 y\u00fcksek verimlilik, uygun fiyat ve h\u0131zl\u0131 teslimat s\u00fcreleri nedeniyle tercih edildi.<\/p>\n<p>SST-600\u2019\u00fcn DIN ve API standartlar\u0131yla uyumlu, projeye \u00f6zel buhar ak\u0131\u015f yolu dizayn\u0131na sahip, eksensel ve radyal \u00e7\u0131k\u0131\u015fl\u0131 esnek ve mod\u00fcler tasar\u0131m\u0131, ba\u015far\u0131s\u0131 kan\u0131tlanm\u0131\u015f bir \u00e7\u00f6z\u00fcm sunmaktad\u0131r. Y\u00fcksek g\u00fcvenilirlik ve eri\u015filebilirlik sa\u011flayan Siemens SST-600 Buhar T\u00fcrbini, hem kondenserli hem de kar\u015f\u0131-bas\u0131n\u00e7l\u0131 uygulamalarda kullan\u0131lmaktad\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.hurriyet.com.tr\/ekonomi\/yilda-250-bin-ton-atik-bertarafi-ile-200-milyon-kw-saat-elektrik-uretilecek-40944754\" target=\"_blank\" rel=\"noopener\">H\u00fcrriyet<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Afyon\u2019da kurulumu yap\u0131lan 27 MWe kapasiteye sahip EBER Biyok\u00fctle Yakma Tesisi i\u00e7in Siemens SST-600 Buhar T\u00fcrbini tercih edildi. Tamamland\u0131\u011f\u0131nda T\u00fcrkiye\u2019nin ikinci en b\u00fcy\u00fck [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78325,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,51,53],"tags":[34144,7131,36608,39106,29816,39107,34979,26353,19,67,1009,1053,39108],"views":1390,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78324"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78324"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78324\/revisions"}],"predecessor-version":[{"id":78328,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78324\/revisions\/78328"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78325"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78324"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78324"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78324"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}