{"id":78234,"date":"2018-09-02T22:51:29","date_gmt":"2018-09-02T19:51:29","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78234"},"modified":"2018-09-02T22:51:29","modified_gmt":"2018-09-02T19:51:29","slug":"guney-afrikadan-9600-mwlik-nukleer-santral-yatirim-planina-iptal-karari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/guney-afrikadan-9600-mwlik-nukleer-santral-yatirim-planina-iptal-karari\/","title":{"rendered":"(Turkish) G\u00fcney Afrika&#8217;dan 9600 MW&#8217;l\u0131k N\u00fckleer Santral Yat\u0131r\u0131m Plan\u0131na \u0130ptal Karar\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78234\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>G\u00fcney Afrika taraf\u0131ndan \u00fclkede yer alan iki reakt\u00f6re y\u00f6nelik 2030 y\u0131l\u0131na kadar 9600 Mw g\u00fc\u00e7 ile n\u00fckleer santral yat\u0131r\u0131m\u0131 art\u0131rma plan\u0131 iptal edildi.<img loading=\"lazy\" class=\"alignright size-medium wp-image-78235\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/guney-afrika-9600-mw-lik-nukleer-santral-yati-11183527_o-300x199.jpg\" alt=\"\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/guney-afrika-9600-mw-lik-nukleer-santral-yati-11183527_o-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/guney-afrika-9600-mw-lik-nukleer-santral-yati-11183527_o-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/guney-afrika-9600-mw-lik-nukleer-santral-yati-11183527_o-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/09\/guney-afrika-9600-mw-lik-nukleer-santral-yati-11183527_o.jpg 640w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><span id=\"more-101618\"><\/span><\/p>\n<p>Devlet Ba\u015fkan\u0131 Cyril Ramaphosa\u2019\u0131n yapt\u0131\u011f\u0131 a\u00e7\u0131klamada n\u00fckleer enerji yerine do\u011fal gaz, r\u00fczgar ve di\u011fer enerji kaynaklar\u0131n\u0131n pay\u0131n\u0131n artt\u0131r\u0131lmas\u0131 planlar\u0131n\u0131n oldu\u011funu belirtti.<\/p>\n<p>Afrika\u2019n\u0131n tek n\u00fckleer g\u00fcc\u00fc 1860 mw olup alt\u0131 defa ilave n\u00fckleer g\u00fc\u00e7 kurulmas\u0131na y\u00f6nelik konu masaya yat\u0131ld\u0131 ve y\u00fcksek maliyetler ve \u00e7e\u015fitli nedenlerden \u00f6t\u00fcr\u00fc iptal edildi. Enerji Bakan\u0131 Jeff Radebe ise h\u00fck\u00fcmetin yeni entegre planlar\u0131n\u0131 halka a\u00e7\u0131klarken \u201c2030 y\u0131l\u0131na kadar n\u00fckleer enerji planlar\u0131n\u0131 art\u0131rmaya y\u00f6nelik bir e\u011filim yoktur\u201d dedi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.G\u00fcney Afrika taraf\u0131ndan \u00fclkede yer alan iki reakt\u00f6re y\u00f6nelik 2030 y\u0131l\u0131na kadar 9600 Mw g\u00fc\u00e7 ile n\u00fckleer santral yat\u0131r\u0131m\u0131 art\u0131rma plan\u0131 iptal edildi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78235,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[67,1009,4505,1133,21,23134,25480,88,14014,34930,1286],"views":902,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78234"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78234"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78234\/revisions"}],"predecessor-version":[{"id":78236,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78234\/revisions\/78236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78235"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78234"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78234"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78234"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}