{"id":78149,"date":"2018-08-30T23:34:08","date_gmt":"2018-08-30T20:34:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78149"},"modified":"2018-08-30T23:34:08","modified_gmt":"2018-08-30T20:34:08","slug":"artvin-ve-erzuruma-32-mw-gucunde-tortum-ii-hes-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/artvin-ve-erzuruma-32-mw-gucunde-tortum-ii-hes-yapilacak\/","title":{"rendered":"(Turkish) Artvin ve Erzurum\u2019a 32 MW G\u00fcc\u00fcnde Tortum II HES Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78149\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Arsin Enerji taraf\u0131ndan Artvin ve Erzurum il s\u0131n\u0131rlar\u0131 i\u00e7erisinde yer alacak 32 MW g\u00fcc\u00fcnde Tortum-II Hidroelektrik Santrali yap\u0131lacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-full wp-image-78150\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/artvin-ve-erzuruma-32-mw-gucunde-tortum-ii-hes-yapilacak.jpg\" alt=\"\" width=\"297\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/artvin-ve-erzuruma-32-mw-gucunde-tortum-ii-hes-yapilacak.jpg 297w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/artvin-ve-erzuruma-32-mw-gucunde-tortum-ii-hes-yapilacak-80x46.jpg 80w\" sizes=\"(max-width: 297px) 100vw, 297px\" \/>Artvin \u0130li, Yusufeli \u0130l\u00e7esi, Morkaya K\u00f6y\u00fc ile Erzurum \u0130li, Uzundere \u0130l\u00e7esi, \u00c7a\u011flayan ve Uluba\u011f Mahallesi s\u0131n\u0131rlar\u0131 i\u00e7erisinde Tortum \u00c7ay\u0131 \u00fczerinde Arsin Enerji taraf\u0131ndan \u201cTortum II Reg\u00fclat\u00f6r\u00fc ve HES (33,682 Wm\/32,345 MWe), K\u0131rma-Eleme Tesisi ve Haz\u0131r Beton Santrali Projesi\u201dnin hayata ge\u00e7irilecektir.<\/p>\n<p>Yatay eksenli Francis tipi santral binas\u0131 ve kuyruk suyu de\u015farj kanal\u0131ndan meydana gelecek santralde in\u015faat a\u015famas\u0131nda 75, i\u015fletme a\u015famas\u0131nda ise 10 personel istihdam edilecek.<\/p>\n<p>Yakla\u015f\u0131k 160 milyon lira yat\u0131r\u0131m bedeline sahip proje kapsam\u0131nda y\u0131lda toplam 90,73 GWh elektrik enerjisi \u00fcretimi ger\u00e7ekle\u015ftirilecek. \u00dcretilen elektrik, 3.0 AWG PIGEON iletkeni ile 5 km mesafede yer alan Tortum-I TM\u2019ye ba\u011flanacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Arsin Enerji taraf\u0131ndan Artvin ve Erzurum il s\u0131n\u0131rlar\u0131 i\u00e7erisinde yer alacak 32 MW g\u00fcc\u00fcnde Tortum-II Hidroelektrik Santrali yap\u0131lacak. Artvin \u0130li, Yusufeli \u0130l\u00e7esi, Morkaya [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78150,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[39030,1089,68,67,1009,7708,26043,26044,39031,26829],"views":1418,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78149"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78149"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78149\/revisions"}],"predecessor-version":[{"id":78151,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78149\/revisions\/78151"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78150"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78149"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78149"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78149"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}