{"id":78083,"date":"2018-08-28T17:50:24","date_gmt":"2018-08-28T14:50:24","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=78083"},"modified":"2018-08-28T17:50:51","modified_gmt":"2018-08-28T14:50:51","slug":"ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) \u0130lk Te\u015fviksiz End\u00fcstriyel GES&#8217;in Kurulumu \u0130ngiltere\u2019de Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/78083\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130ngiliz enerji firmas\u0131 olan WolfeWare taraf\u0131ndan \u0130ngiltere\u2019de ilk te\u015fviksiz end\u00fcstriyel G\u00fcne\u015f Enerjisi Santrali (GES) Oxfordshire&#8217;de kurulacak.<img loading=\"lazy\" class=\"alignright size-medium wp-image-78084\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ilk-tesviksiz-endustriyel-gesin-ingilterede-kurulumu-yapilacak.jpg 667w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>WolfeWare, Birle\u015fik Krall\u0131k\u2019\u0131n ilk te\u015fviksiz G\u00fcne\u015f Enerjisi Santrali\u2019ni Oxfordshire kentinde kuracak olup Westcott Venture Park b\u00f6lgesinde kurulumu yap\u0131lacak 15 mw enerji \u00fcretim kapasitesine sahip santrali British Solar Renewables (BSR) Grubuna ait olan m\u00fchendislik, tedarik ve servis kolu taraf\u0131ndan yap\u0131lacak.<\/p>\n<p>60,000 adet g\u00fcne\u015f panelinden meydana gelecek santral y\u0131lda 14.5 gw \/ saat elektrik \u00fcretimi yaparak \u00f6n\u00fcm\u00fczdeki yaz \u00fcretime ge\u00e7ecek ve 600\u2019den fazla ki\u015fiye i\u015f olana\u011f\u0131 da sa\u011flayacak.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ngiliz enerji firmas\u0131 olan WolfeWare taraf\u0131ndan \u0130ngiltere\u2019de ilk te\u015fviksiz end\u00fcstriyel G\u00fcne\u015f Enerjisi Santrali (GES) Oxfordshire&#8217;de kurulacak. WolfeWare, Birle\u015fik Krall\u0131k\u2019\u0131n ilk te\u015fviksiz G\u00fcne\u015f Enerjisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":78084,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,67,1009,2326,227,23416,2569,2206,23131,1092,2077,39012],"views":1054,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78083"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=78083"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78083\/revisions"}],"predecessor-version":[{"id":78086,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/78083\/revisions\/78086"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/78084"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=78083"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=78083"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=78083"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}