{"id":77947,"date":"2018-08-23T21:49:30","date_gmt":"2018-08-23T18:49:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77947"},"modified":"2018-08-23T21:49:30","modified_gmt":"2018-08-23T18:49:30","slug":"istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) \u0130stanbul\u2019da 50 MW G\u00fcce Sahip \u015eile RES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77947\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u00c7evrim Enerji taraf\u0131ndan \u0130stanbul\u2019un \u00c7atalca ve Silivri il\u00e7eleri s\u0131n\u0131rlar\u0131nda yer alan 50 MW kapasiteye sahip \u015eile R\u00fczgar Enerjisi Santrali kurulup i\u015fletilecek.<img loading=\"lazy\" class=\"alignright size-medium wp-image-77948\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak-300x196.jpg\" alt=\"\" width=\"300\" height=\"196\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak-300x196.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak-500x326.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/istanbulda-50-mw-gucu-sahip-sile-res-kurulumu-yapilacak.jpg 720w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>\u0130stanbul&#8217;un Silivri ve \u00c7atalca \u0130l\u00e7eleri s\u0131n\u0131rlar\u0131nda r\u00fczgardan elektrik enerjisi \u00fcretmeye y\u00f6nelik toplam da 50 MWm\/50 MWe kurulu g\u00fcce sahip \u015e\u0130LE RES projesi kurularak i\u015fletilecektir.<\/p>\n<p>125 Milyon lira yat\u0131r\u0131m bedeli olan projeyle 25 adet 2 MWm\/2 MWe g\u00fcc\u00fcnde r\u00fczgar t\u00fcrbini kurulup t\u00fcrbinler ile y\u0131lda 175.000.000 kWh elektrik \u00fcretimi yap\u0131larak \u00fcretilen elektrik enerji nakil hatt\u0131yla tek hat \u015femas\u0131na uygun \u015fekilde Yama\u00e7tepe-2 RES TM 154 Kv Y\u00fcksek gerilim hatt\u0131na ba\u011flanacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u00c7evrim Enerji taraf\u0131ndan \u0130stanbul\u2019un \u00c7atalca ve Silivri il\u00e7eleri s\u0131n\u0131rlar\u0131nda yer alan 50 MW kapasiteye sahip \u015eile R\u00fczgar Enerjisi Santrali kurulup i\u015fletilecek. \u0130stanbul&#8217;un Silivri [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77948,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,474,35002,24949,231,35004,23318,34960],"views":1348,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77947"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77947"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77947\/revisions"}],"predecessor-version":[{"id":77949,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77947\/revisions\/77949"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77948"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77947"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77947"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77947"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}