{"id":77828,"date":"2018-08-20T22:37:15","date_gmt":"2018-08-20T19:37:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77828"},"modified":"2018-08-20T22:37:15","modified_gmt":"2018-08-20T19:37:15","slug":"akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali-res","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali-res\/","title":{"rendered":"(Turkish) Akyelres&#8217;ten Karaman ve Mersin\u2019de 10 MW&#8217;l\u0131k R\u00fczgar Enerjisi Santrali (RES)"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77828\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akyelres firmas\u0131 taraf\u0131ndan Karaman \u0130li Merkez \u0130l\u00e7e \u00c7ativikdere Mevkii ve Mersin \u0130li, Mut \u0130l\u00e7esi, G\u00fcme ve Demirkap\u0131 Mahallelerinde 10 MW g\u00fcc\u00fcnde R\u00fczg\u00e2r Enerji Santrali (RES) kurulup i\u015fletilecektir.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-77829\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali-300x158.jpg\" alt=\"\" width=\"300\" height=\"158\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali-300x158.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali-80x42.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/akyelresten-karaman-ve-mersinde-10-mwlik-ruzgar-enerjisi-santrali.jpg 366w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>40 milyon lira yat\u0131r\u0131m bedeli ile kurulacak olan Akyelres-2 R\u00fczgar Enerji Santrali\u2019nde, her biri 1 MW kurulu g\u00fc\u00e7te 10 adet r\u00fczg\u00e2r t\u00fcrbini kurulumu yap\u0131lacak. T1, T2, T3, T4, T5 ve T6 numaral\u0131 t\u00fcrbinler ve idari bina Karaman il s\u0131n\u0131rlar\u0131nda di\u011fer t\u00fcrbinler ise (T7, T8, T9 ve T10 numaral\u0131 t\u00fcrbinler) Mersin il s\u0131n\u0131rlar\u0131nda yer alacakt\u0131r.<\/p>\n<p>Kurulacak olan santral ile y\u0131lda toplam da 35.000.000 kWh\/y\u0131l (35,000 GWh\/y\u0131l) elektrik \u00fcretilmesi planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akyelres firmas\u0131 taraf\u0131ndan Karaman \u0130li Merkez \u0130l\u00e7e \u00c7ativikdere Mevkii ve Mersin \u0130li, Mut \u0130l\u00e7esi, G\u00fcme ve Demirkap\u0131 Mahallelerinde 10 MW g\u00fcc\u00fcnde R\u00fczg\u00e2r Enerji [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77829,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[38927,38928,68,67,1009,1679,1301,474,69,24949,231,23318,312,34960],"views":1613,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77828"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77828"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77828\/revisions"}],"predecessor-version":[{"id":77830,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77828\/revisions\/77830"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77829"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77828"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77828"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77828"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}