{"id":77783,"date":"2018-08-19T22:50:04","date_gmt":"2018-08-19T19:50:04","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77783"},"modified":"2018-08-19T22:50:04","modified_gmt":"2018-08-19T19:50:04","slug":"kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi\/","title":{"rendered":"(Turkish) Kahta OSB&#8217;nin \u0130lk G\u00fcne\u015f Enerjisi Santralleri Devreye Al\u0131nd\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77783\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>ADIYAMAN \/ Kahta il\u00e7esi Organize Sanayi B\u00f6lgesi\u2019nde yenilenebilir enerjiye dayal\u0131 \u00fcretim yapan ilk g\u00fcne\u015f enerji santralleri hizmete girdi.<\/strong><\/p>\n<p>OSB\u2019de faaliyette bulunan iki firman\u0131n hem \u00e7at\u0131 hem de araziye kurdu\u011fu g\u00fcne\u015f panellerinin Teda\u015f Genel <img loading=\"lazy\" class=\"alignright size-medium wp-image-77784\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi-300x225.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi-768x576.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi-500x375.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/kahta-osbnin-ilk-gunes-enerjisi-santralleri-devreye-alindi.jpg 800w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>M\u00fcd\u00fcrl\u00fc\u011f\u00fc ve OSB yetkilileri taraf\u0131ndan ge\u00e7ici kabul i\u015flemleri yap\u0131larak hizmete al\u0131nm\u0131\u015ft\u0131r.<\/p>\n<p>240 kW ve 150 kW kurulu g\u00fcce sahip olan g\u00fcne\u015f santrallerinin y\u0131lda yakla\u015f\u0131k 700 bin kilowatt\u00a0saat (kWh) elektrik enerjisi \u00fcretimi yapacak olup 400 ton karbon sal\u0131n\u0131m\u0131n\u0131 engelleyecek kapasiteye de sahiptir.<\/p>\n<p>G\u00fcne\u015f \u0131\u015f\u0131n\u0131m\u0131 bak\u0131m\u0131ndan ortalama 1800 kWh\/ metrekareye ve g\u00fcne\u015flenme s\u00fcreleri uzunlu\u011fu a\u00e7\u0131s\u0131ndan T\u00fcrkiye\u2019nin \u00f6nemli merkezlerinden birisi konumundaki Kahta OSB\u2019de yenilenebilir enerji kaynakl\u0131 ilk g\u00fcne\u015f enerji santralleri \u00e7evre dostu yap\u0131s\u0131yla \u00fclke ekonomisine de art\u0131 de\u011fer katacakt\u0131r. Toplam olarak 1600 g\u00fcne\u015f panelinin ve 12 invert\u00f6r\u00fcn kullan\u0131ld\u0131\u011f\u0131 projenin yat\u0131r\u0131m bedeli ise yakla\u015f\u0131k 1 milyon 800 bin TL olmu\u015ftur.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.ADIYAMAN \/ Kahta il\u00e7esi Organize Sanayi B\u00f6lgesi\u2019nde yenilenebilir enerjiye dayal\u0131 \u00fcretim yapan ilk g\u00fcne\u015f enerji santralleri hizmete girdi. OSB\u2019de faaliyette bulunan iki firman\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77784,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,2326,23416,2569,1876,23133,23131,36764,36765,11110],"views":777,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77783"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77783"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77783\/revisions"}],"predecessor-version":[{"id":77785,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77783\/revisions\/77785"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77784"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77783"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77783"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77783"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}