{"id":77769,"date":"2018-08-19T16:50:42","date_gmt":"2018-08-19T13:50:42","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77769"},"modified":"2018-08-19T16:51:30","modified_gmt":"2018-08-19T13:51:30","slug":"boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Boydak&#8217;tan Silivri\u2019ye 100 MW G\u00fcc\u00fcnde \u00d6merli RES Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77769\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Boydak Enerji \u015firketlerinden Betim Enerji taraf\u0131ndan \u0130stanbul\u2019un Silivri il\u00e7esinde\u00a0\u00a050 adet t\u00fcrbinle 100 MWm kurulu g\u00fcc\u00fc olacak \u201c\u00d6merli R\u00fczgar Enerji Santrali\u201d projesinin yap\u0131lmas\u0131 planlan\u0131yor.<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-77770\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak-300x192.jpg\" alt=\"\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak-78x50.jpg 78w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/boydaktan-silivriye-100-mw-gucunde-omerli-res-kurulumu-yapilacak.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Kurulacak olan r\u00fczgar t\u00fcrbini olarak ise Enercon Marka E-82 Model ve 2 MW t\u00fcrbin modelleri yer alacak. Santralin toplamda 48 ayda tamamlanarak toplam da 430 milyon lira yat\u0131r\u0131m yap\u0131lmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Santralin daha \u00f6nceki yeri \u0130stanbul\u2019un \u015eile ve Pendik il\u00e7e s\u0131n\u0131rlar\u0131 i\u00e7inde planlanm\u0131\u015f fakat daha sonra yer de\u011fi\u015fikli\u011fi yap\u0131lm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Boydak Enerji \u015firketlerinden Betim Enerji taraf\u0131ndan \u0130stanbul\u2019un Silivri il\u00e7esinde\u00a0\u00a050 adet t\u00fcrbinle 100 MWm kurulu g\u00fcc\u00fc olacak \u201c\u00d6merli R\u00fczgar Enerji Santrali\u201d projesinin yap\u0131lmas\u0131 planlan\u0131yor. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77770,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[38911,38909,6698,68,67,1009,1967,38910,474,69,24949,231,23318,34960,2619],"views":2113,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77769"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77769"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77769\/revisions"}],"predecessor-version":[{"id":77772,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77769\/revisions\/77772"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77770"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77769"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77769"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77769"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}