{"id":77709,"date":"2018-08-18T20:47:22","date_gmt":"2018-08-18T17:47:22","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77709"},"modified":"2018-08-19T00:52:12","modified_gmt":"2018-08-18T21:52:12","slug":"rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu\/","title":{"rendered":"(Turkish) Rusya&#8217;dan Akkuyu NGS\u2019nin 1200 MW\u2019l\u0131k \u0130kinci \u00dcnitesi \u0130\u00e7in Lisans Ba\u015fvurusu"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77709\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye ve ABD aras\u0131nda ekonomik sava\u015f s\u00fcrerken Rusya&#8217;dan Mersin-Akkuyu\u2019da in\u015fa edilen n\u00fckleer santrale y\u00f6nelik yeni bir hamle geldi. \u0130lk \u00fcniteyi 2023&#8217;te yeti\u015ftirmeyi planlayan Rusya, bin 200 mw g\u00fcc\u00fcndeki ikinci \u00fcnite i\u00e7in lisans ba\u015fvurusunu yapt\u0131. N\u00fckleer D\u00fczenleme Kurumu ise ba\u015fvuruyu incelemekte olup k\u0131sa s\u00fcrede lisans verecektir.<\/strong><span id=\"more-101489\"><\/span><\/p>\n<p>T\u00fcrkiye\u2019nin ilk n\u00fckleer santralinin temeli nisan&#8217;da Akkuyu\u2019da at\u0131ld\u0131. Projeyi \u00fcstlenen Rus Rosatom, her<strong><img loading=\"lazy\" class=\"alignright size-medium wp-image-77711\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu-300x170.jpg\" alt=\"\" width=\"300\" height=\"170\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu-300x170.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu-500x283.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/rusyadan-akkuyu-ngsnin-1200-mwlik-ikinci-unitesi-icin-lisans-basvurusu.jpg 760w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong> biri 1.200 mw g\u00fcc\u00fcnde 4 \u00fcniteden meydana gelen n\u00fckleer santral in\u015fa edecek.<\/p>\n<p>Akkuyu\u2019nun ilk \u00fcnitesinin in\u015faat\u0131na y\u00f6nelik Rusya\u2019da da n\u00fckleer santralin kritik par\u00e7alar\u0131n\u0131n imalat\u0131 s\u00fcr\u00fcyor. \u0130lk \u00fcnite, T\u00fcrkiye Cumhuriyeti\u2019nin 100\u2019\u00fcnc\u00fc kurulu\u015f y\u0131l d\u00f6n\u00fcm\u00fcne yeti\u015ftirilecek olup santral, T\u00fcrkiye\u2019nin elektrik ihtiyac\u0131n\u0131n % 10\u2019unu kar\u015f\u0131layacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye ve ABD aras\u0131nda ekonomik sava\u015f s\u00fcrerken Rusya&#8217;dan Mersin-Akkuyu\u2019da in\u015fa edilen n\u00fckleer santrale y\u00f6nelik yeni bir hamle geldi. \u0130lk \u00fcniteyi 2023&#8217;te yeti\u015ftirmeyi planlayan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77711,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[3019,67,1009,5744,36430,23134,25480,88,34930,885],"views":805,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77709"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77709"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77709\/revisions"}],"predecessor-version":[{"id":77740,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77709\/revisions\/77740"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77711"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77709"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77709"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77709"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}