{"id":77659,"date":"2018-08-16T17:30:30","date_gmt":"2018-08-16T14:30:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77659"},"modified":"2018-08-16T17:31:59","modified_gmt":"2018-08-16T14:31:59","slug":"eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede\/","title":{"rendered":"(Turkish) Eski\u015fehir Alpu Termik Santrali \u0130\u00e7in Verilen T\u00fcm \u0130zinler Mahkemede&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77659\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Eski\u015fehir\u2019in Tepeba\u015f\u0131 il\u00e7esinde yap\u0131lmas\u0131 planlanan Alpu Termik Santrali ve K\u00f6m\u00fcr \u0130\u015fletmesi i\u00e7in daha \u00f6nce 15 A\u011fustos\u2019ta yap\u0131laca\u011f\u0131 duyurulan \u00f6zelle\u015ftirme ihalesi 17 Ekim\u2019e ertelendi. Verilen t\u00fcm izin ve i\u015flemler hakk\u0131nda dava a\u00e7\u0131lan proje, d\u00f6viz \u00fczerinden al\u0131m garantisiyle \u00f6zel sekt\u00f6re devredilecek.<\/strong><\/p>\n<p>Alpu Termik Santrali\u2019nin daha \u00f6nce 15 A\u011fustos\u2019ta yap\u0131laca\u011f\u0131 duyurulan \u00f6zelle\u015ftirme ihalesi 17 Ekim\u2019e <img loading=\"lazy\" class=\"alignleft size-medium wp-image-77660\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede1-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede1-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede1-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede1-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/eskisehir-alpu-termik-santrali-icin-verilen-tum-izinler-mahkemede1.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>ertelendi. TEMA Vakf\u0131, ihalesi 4. kez ertelenen santralin \u00e7evresel, ekonomik ve sosyal etkilerine bir kez daha dikkat \u00e7ekiyor. TEMA Vakf\u0131, 1\/100.000 \u00f6l\u00e7ekli Eski\u015fehir \u00c7evre D\u00fczeni Plan\u0131 (\u00c7DP) de\u011fi\u015fikli\u011fi, \u00e7evresel etki de\u011ferlendirmesi (\u00c7ED) olumlu karar\u0131 ve Toprak Koruma Kurulu (TKK) karar\u0131 hakk\u0131nda dava a\u00e7arak, termik santralin yer se\u00e7imi s\u00fcrecindeki yanl\u0131\u015flardan projenin teknik eksiklerine ve hatalar\u0131na dikkat \u00e7ekti.<\/p>\n<p>\u00d6ncelikle projenin yer se\u00e7imindeki hatalara de\u011finen TEMA Vakf\u0131 Y\u00f6netim Kurulu Ba\u015fkan\u0131 Deniz Ata\u00e7, \u201cProje yer se\u00e7imi olarak iki temel yanl\u0131\u015f\u0131 bar\u0131nd\u0131r\u0131yor; birincisi Alpu Ovas\u0131\u2019n\u0131n \u201cb\u00fcy\u00fck ova\u201d olmas\u0131 ikincisi de maden sahas\u0131 i\u00e7inde 1. derece arkeolojik sit alanlar\u0131 bulunmas\u0131d\u0131r. Di\u011fer yandan b\u00f6lge i\u00e7in \u00f6nemli bir simge olan, 5.000 y\u0131ld\u0131r bilinen ve kullan\u0131lan l\u00fcle ta\u015f\u0131n\u0131n rezervlerinin b\u00fcy\u00fck b\u00f6l\u00fcm\u00fc Eski\u015fehir s\u0131n\u0131rlar\u0131 i\u00e7inde bulunuyor. Projenin k\u00fcl depolama sahalar\u0131n\u0131n yap\u0131laca\u011f\u0131 b\u00f6lgede l\u00fcle ta\u015f\u0131 rezervleri var. \u00d6nemli bir k\u00fclt\u00fcr miras\u0131m\u0131z\u0131 kaybetme tehlikesi ile kar\u015f\u0131 kar\u015f\u0131yay\u0131z. Ayr\u0131ca bu b\u00f6lge su varl\u0131klar\u0131 a\u00e7\u0131s\u0131ndan da k\u0131r\u0131lgan \u00f6zellikler g\u00f6steriyor. Buna ra\u011fmen termik santral gibi \u00e7ok b\u00fcy\u00fck miktarlarda su t\u00fcketen bir projenin burada yap\u0131lmas\u0131 planlan\u0131yor. Bu durumun su varl\u0131klar\u0131na ciddi tehdit olu\u015fturaca\u011f\u0131n\u0131 d\u00fc\u015f\u00fcn\u00fcyoruz\u201d dedi.<\/p>\n<p><strong>\u00c7ED raporunda \u00f6nemli eksiklik var<\/strong><\/p>\n<p>Ayr\u0131ca \u00c7ED s\u00fcreci ile ilgili aksakl\u0131klara da de\u011finen Deniz Ata\u00e7, \u201c\u00c7ED raporunda g\u00fcvenli madencilik faaliyeti a\u00e7\u0131s\u0131ndan kritik olan hidrojeolojik \u00e7al\u0131\u015fmalar\u0131n hen\u00fcz tamamlanmam\u0131\u015f oldu\u011fu belirtiliyor. Ayr\u0131ca at\u0131k su, k\u00f6m\u00fcr, k\u00fcl depolar\u0131 ve maden sular\u0131n\u0131n drenaj\u0131 ile ilgili sorunlara de\u011finilmiyor. Yer alt\u0131ndan k\u00f6m\u00fcr\u00fcn \u00e7\u0131kar\u0131lmas\u0131 i\u00e7in yap\u0131lacak susuzla\u015ft\u0131rma \u00e7al\u0131\u015fmalar\u0131na dair a\u00e7\u0131k ifadelere yer verilmedi\u011fi g\u00f6r\u00fcl\u00fcyor; yer alt\u0131ndan \u00e7ekilecek suyun miktar\u0131, Porsuk Nehri\u2019ne bo\u015falt\u0131laca\u011f\u0131 yerde ne t\u00fcr ar\u0131tma tekni\u011finin uygulanaca\u011f\u0131 gibi bilgiler eksik. \u00c7ED Raporu bu haliyle \u00e7evresel etkileri ve al\u0131nacak \u00f6nlemleri ortaya koymuyor ve \u00f6nemli eksiklikler var\u201d dedi.<\/p>\n<p><strong>Bakanlar Kurulu \u201cb\u00fcy\u00fck ova\u201d ilan etti, Enerji Bakanl\u0131\u011f\u0131 termik santral \u00f6nerdi<\/strong><\/p>\n<p>Termik santralin planland\u0131\u011f\u0131 ve k\u00f6m\u00fcr madeninin \u00e7\u0131kar\u0131laca\u011f\u0131 alan, tar\u0131msal potansiyeli nedeniyle Bakanlar Kurulu\u2019nun \u201cb\u00fcy\u00fck ova\u201d yani \u201ctar\u0131msal sit\u201d ilan etti\u011fi Alpu Ovas\u0131\u2019n\u0131n i\u00e7inde. Bakanlar Kurulu karar\u0131na g\u00f6re, tar\u0131mdan ba\u015fka faaliyet yap\u0131lmamas\u0131 gereken ovada iki tar\u0131msal sulama yat\u0131r\u0131m\u0131 ba\u015flam\u0131\u015f durumda. Toplam 1.500 hektarl\u0131k alan\u0131n sulamaya a\u00e7\u0131lmas\u0131 anlam\u0131na gelen bu yat\u0131r\u0131m her sene 6 milyon TL\u2019lik ek tar\u0131msal gelir ve 3.000 ki\u015fiye tar\u0131msal istihdam anlam\u0131na geliyor. Buna kar\u015f\u0131l\u0131k, s\u00f6z konusu termik santral projesi bu sulama projelerinin hepsini at\u0131l hale getirecektir. Yedi k\u00f6y\u00fcn yer alt\u0131 suyu sulama kooperatiflerine ait yat\u0131r\u0131mlar\u0131 termik santral projesi nedeniyle zarar g\u00f6recektir. Derin su kuyular\u0131 ve bu sulara ba\u011fl\u0131 tar\u0131msal faaliyetler etkilenecektir.<\/p>\n<p><strong>Tar\u0131m alan\u0131na termik santral yapabilmek i\u00e7in Toprak Koruma Kurulu (TKK) y\u00f6netmeli\u011fi de\u011fi\u015ftirildi<\/strong><\/p>\n<p>\u00d6nerilen termik santral projesi tar\u0131m alan\u0131 \u00fczerinde oldu\u011fu i\u00e7in Eski\u015fehir \u0130l Toprak Koruma Kurulu\u2019nun sahan\u0131n tar\u0131m d\u0131\u015f\u0131na \u00e7\u0131kar\u0131lmas\u0131 i\u00e7in izin vermesi gerekiyordu. 2 Ocak 2018 tarihinde toplanan kurulda Elektrik \u00dcretim A.\u015e.\u2019nin (E\u00dcA\u015e) tar\u0131m d\u0131\u015f\u0131na \u00e7\u0131karma talebi, kurulda nitelikli \u00e7o\u011funluk sa\u011flanamad\u0131\u011f\u0131 i\u00e7in reddedildi. Ayn\u0131 ay i\u00e7inde TKK\u2019da karar alma s\u00fcre\u00e7lerini d\u00fczenleyen y\u00f6netmelik de\u011fi\u015ftirildi ve \u201ckamunun enerji ve ula\u015f\u0131m projeleri\u201d i\u00e7in kabul say\u0131s\u0131 i\u00e7in toplant\u0131 salt \u00e7o\u011funlu\u011fu yeterli hale getirildi. 30 Ocak\u2019ta E\u00dcA\u015e tekrar bu alan\u0131 tar\u0131m d\u0131\u015f\u0131na \u00e7\u0131karma talebi yapt\u0131 ve karar salt \u00e7o\u011funlukla kabul edildi.<\/p>\n<p><strong>Termik santralden \u00fcretilecek elektrik maliyetli<\/strong><\/p>\n<p>Termik santral ve k\u00f6m\u00fcr madencili\u011fi projesinin t\u00fcm izin s\u00fcre\u00e7leri Enerji ve Tabi Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n elektrik \u015firketi E\u00dcA\u015e taraf\u0131ndan y\u00fcr\u00fct\u00fcld\u00fc. Ancak proje \u00f6zelle\u015ftirme kapsam\u0131na al\u0131nd\u0131. Santralin 15 sene boyunca \u00fcretece\u011fi elektri\u011fi piyasa fiyatlar\u0131n\u0131n \u00fcst\u00fcnde bir fiyat ile Bakanl\u0131k sat\u0131n alacak. Kamu projesi gibi g\u00f6z\u00fcken bu proje asl\u0131nda bir \u00f6zel sekt\u00f6r projesidir. Di\u011fer yandan k\u00f6m\u00fcrden \u00fcretilen elektri\u011fin fiyat\u0131, sa\u011fl\u0131k, \u00e7evre, iklim maliyetleri ve yat\u0131r\u0131m maliyetleri nedeniyle y\u00fckseldi. G\u00fcne\u015ften \u00fcretilen elektri\u011fin birim fiyat\u0131 2,99 dolar cent d\u00fczeylerindeyken k\u00f6m\u00fcr i\u00e7in bu fiyat 6,04 dolar cent seviyelerindedir. Piyasadaki elektrik fiyatlar\u0131 ise 2,8 &#8211; 3 dolar cent civar\u0131ndad\u0131r. Yani, k\u00f6m\u00fcrden elektrik \u00fcretmenin pahal\u0131 oldu\u011fu g\u00f6r\u00fcl\u00fcyor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Eski\u015fehir\u2019in Tepeba\u015f\u0131 il\u00e7esinde yap\u0131lmas\u0131 planlanan Alpu Termik Santrali ve K\u00f6m\u00fcr \u0130\u015fletmesi i\u00e7in daha \u00f6nce 15 A\u011fustos\u2019ta yap\u0131laca\u011f\u0131 duyurulan \u00f6zelle\u015ftirme ihalesi 17 Ekim\u2019e ertelendi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77661,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,24649],"tags":[38877,10743,2878,8055,33895,67,1009,38876,38878,34967,9309,38692],"views":907,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77659"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77659"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77659\/revisions"}],"predecessor-version":[{"id":77662,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77659\/revisions\/77662"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77661"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77659"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77659"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77659"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}