{"id":77612,"date":"2018-08-15T21:27:35","date_gmt":"2018-08-15T18:27:35","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77612"},"modified":"2018-08-15T21:27:35","modified_gmt":"2018-08-15T18:27:35","slug":"ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak\/","title":{"rendered":"(Turkish) Ukrayna&#8217;da 400 MW Kapasiteye Sahip G\u00fcne\u015f Paneli Fabrikas\u0131 Kurulacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77612\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ukrayna\u2019n\u0131n Enerji Verimlili\u011fi ve Enerji Tasarrufu Devlet Ajans\u0131 taraf\u0131ndan \u00fclkenin bat\u0131s\u0131nda bulunan Vinnytsia\u2019da, y\u0131ll\u0131k 400 MW \u00fcretim kapasitesine sahip olacak bir g\u00fcne\u015f paneli fabrikas\u0131 kurulumunun yap\u0131laca\u011f\u0131 a\u00e7\u0131kland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-77613\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak-768x432.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/ukraynada-400-mw-kapasiteye-sahip-gunes-paneli-fabrikasi-kurulacak-80x45.jpg 80w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Yap\u0131lacak yat\u0131r\u0131m ile her biri 200 MW kapasite iki a\u015famada tamamlanacak, ikinci a\u015fama ise 2019 y\u0131l\u0131nda bitirilecek. Projeyi ger\u00e7ekle\u015ftirecek firma ise \u00fclkede \u015fu ana kadar ki toplam 225 MW g\u00fcc\u00fcnde 33 adet g\u00fcne\u015f enerjisi santralini kurulumu yapan KNESS Grubu&#8217;dur. Tesis y\u0131ll\u0131k \u00fcretiminin 180 milyon dolar olaca\u011f\u0131 tahmin edilirken 400 ki\u015fi i\u00e7in de istihdam yarat\u0131lacak.<\/p>\n<p>Bu y\u0131l Zaporizya b\u00f6lgesi Energodar\u2019da bir ba\u015fka g\u00fcne\u015f paneli \u00fcretim tesisinin ba\u015flat\u0131ld\u0131\u011f\u0131n\u0131 da belirtildi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ukrayna\u2019n\u0131n Enerji Verimlili\u011fi ve Enerji Tasarrufu Devlet Ajans\u0131 taraf\u0131ndan \u00fclkenin bat\u0131s\u0131nda bulunan Vinnytsia\u2019da, y\u0131ll\u0131k 400 MW \u00fcretim kapasitesine sahip olacak bir g\u00fcne\u015f paneli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,38848,23416,11263,23133,38847,23131,2584],"views":1141,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77612"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77612"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77612\/revisions"}],"predecessor-version":[{"id":77614,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77612\/revisions\/77614"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77613"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}