{"id":77520,"date":"2018-08-13T17:29:14","date_gmt":"2018-08-13T14:29:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77520"},"modified":"2018-08-13T17:29:14","modified_gmt":"2018-08-13T14:29:14","slug":"suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor\/","title":{"rendered":"(Turkish) SUOZ Enerji&#8217;nin \u0130lk G\u00fcne\u015f Santrali (GES) Yat\u0131r\u0131m\u0131 Enerji \u00dcretimine Ba\u015fl\u0131yor"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77520\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin gelece\u011fi olan g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde ilkleri ger\u00e7ekle\u015ftiren SUOZ Enerji\u2019nin Mar Solar Panel \u00dcretim Fabrikas\u0131\u2019nda \u00fcretilen paneller ile hayata ge\u00e7irilen Ku\u015fadas\u0131 Lisanss\u0131z G\u00fcne\u015f Enerjisi Santrali enerji \u00fcretimine ba\u015flayacak.<\/strong><\/p>\n<p>Grubun ilk GES yat\u0131r\u0131m\u0131 Ku\u015fadas\u0131 Santrali, normal sistemlerle kar\u015f\u0131la\u015ft\u0131r\u0131ld\u0131\u011f\u0131nda %22 daha fazla elektrik \u00fcretimine olanak sa\u011flayan hareketli g\u00fcne\u015f takip sistemi Array Tracking ve \u00f6zel izleme donan\u0131ml\u0131 <img loading=\"lazy\" class=\"alignleft size-medium wp-image-77521\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor-300x296.jpg\" alt=\"\" width=\"300\" height=\"296\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor-300x296.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor-406x400.jpg 406w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor-51x50.jpg 51w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/suoz-enerjinin-ilk-gunes-santrali-ges-yatirimi-enerji-uretimine-basliyor.jpg 480w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>MonoPerc panel yap\u0131s\u0131 ile T\u00fcrkiye\u2019nin en ileri teknolojisini kullan\u0131yor. 2023 y\u0131l\u0131nda yurti\u00e7inde 150 MW, global pazarda 700 MW GES yat\u0131r\u0131m\u0131 hedeflemektedir.<\/p>\n<p><strong>T\u00fcrkiye\u2019nin En \u0130leri Teknolojisine Sahip Ku\u015fadas\u0131 Lisanss\u0131z G\u00fcne\u015f Enerjisi Santrali<\/strong><\/p>\n<p>Toplam olarak 9.3 MW kurulu g\u00fcce sahip Ku\u015fadas\u0131 Santrali g\u00fcne\u015f takip sistemiyle \u00f6zel izleme donan\u0131m\u0131 gibi \u00f6zellikleri olan MonoPerc panelleriyle T\u00fcrkiye\u2019nin en ileri teknolojisine sahip olan santralin 4,5 MW\u2019lik k\u0131sm\u0131nda Array Tracking System olarak bilinen g\u00fcne\u015f \u0131\u015f\u0131nlar\u0131n\u0131 ideal a\u00e7\u0131yla almaya yarayan sistem yer al\u0131yor. Sistemde panelleri ta\u015f\u0131yan konstr\u00fcksiyon, g\u00fcne\u015fin konumuna g\u00f6re do\u011fuya 52 derece ve bat\u0131ya 52 derece d\u00f6nerek toplamda 104 derecelik hareket kabiliyetiyle g\u00fcn boyunca dik a\u00e7\u0131yla \u0131\u015f\u0131n toplayabiliyor. Bu y\u00f6ntem ile sabit kurulumlu sisteme g\u00f6re ortalama %22\u2019lik daha fazla elektrik \u00fcretilmektedir. Bu fark, yaz aylar\u0131nda %50 oran\u0131na kadar \u00e7\u0131kabiliyor. Standart tracking sistemi r\u00fczgar h\u0131z\u0131 40-50 km \/ saate ula\u015ft\u0131\u011f\u0131nda yatay konuma ge\u00e7erken array tracking sistemi 140 km \/ saatlik r\u00fczgara kadar \u00e7al\u0131\u015fmay\u0131 s\u00fcrd\u00fcr\u00fcyor. Arazi kont\u00fcr\u00fc ve \u015fekline en uygun takip sistemi olan array tracking sistemi, 15 derecelik e\u011fimde bile kolay kurulum imkan\u0131 sa\u011fl\u0131yor. 110 d\u00f6n\u00fcm arazi \u00fczerine kurulan ve toplam 12 parselden olu\u015fan santralde y\u0131ll\u0131k 15.7 GWh elektrik \u00fcretimi ger\u00e7ekle\u015fecek olup yakla\u015f\u0131k 5.000 hanenin elektrik ihtiyac\u0131 kar\u015f\u0131lanm\u0131\u015f olacakt\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin gelece\u011fi olan g\u00fcne\u015f enerjisi sekt\u00f6r\u00fcnde ilkleri ger\u00e7ekle\u015ftiren SUOZ Enerji\u2019nin Mar Solar Panel \u00dcretim Fabrikas\u0131\u2019nda \u00fcretilen paneller ile hayata ge\u00e7irilen Ku\u015fadas\u0131 Lisanss\u0131z G\u00fcne\u015f [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77521,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[67,1009,18,2326,23416,2569,23133,23131,38824,37256],"views":1262,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77520"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77520"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77520\/revisions"}],"predecessor-version":[{"id":77522,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77520\/revisions\/77522"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77521"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77520"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77520"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77520"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}