{"id":77493,"date":"2018-08-13T12:52:53","date_gmt":"2018-08-13T09:52:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77493"},"modified":"2018-08-13T12:52:53","modified_gmt":"2018-08-13T09:52:53","slug":"litvanya-ilk-lng-satis-ihalesini-yapacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/litvanya-ilk-lng-satis-ihalesini-yapacak\/","title":{"rendered":"(Turkish) Litvanya, \u0130lk LNG Sat\u0131\u015f \u0130halesini Yapacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77493\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Litvanya do\u011fal gaz piyasas\u0131 operat\u00f6r\u00fc GET Baltic taraf\u0131ndan Balt\u0131k\u2019taki do\u011falgaz \u015firketleri Litvanya\u2019daki Klaipeda LNG Terminali\u2019nden hacim fazlas\u0131 gaz sat\u0131\u015f\u0131 ihalesine kat\u0131lmalar\u0131na y\u00f6nelik \u00e7a\u011fr\u0131 yap\u0131ld\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-77494\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/litvanya-ilk-lng-satis-ihalesini-yapacak-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/litvanya-ilk-lng-satis-ihalesini-yapacak-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/litvanya-ilk-lng-satis-ihalesini-yapacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/litvanya-ilk-lng-satis-ihalesini-yapacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/litvanya-ilk-lng-satis-ihalesini-yapacak.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>\u015eirket taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada 110 GWh do\u011falgaz\u0131n a\u00e7\u0131k art\u0131rmayla ihale edilece\u011fi belirtildi. \u0130lgilenen firmalar\u0131n 8 A\u011fustos 2018&#8217;a kadar ba\u015fvuru yapmalar\u0131 gerekmektedir. \u0130haleyi kazanan \u015firket ise 10 A\u011fustos 2018&#8217;den ba\u015flayacak olup do\u011falgaz tedari\u011fi 15 A\u011fustos-30 Eyl\u00fcl tarihleri aras\u0131nda d\u00fczenlenecek. GET Baltic gaz tedari\u011finin 10 GWh\u2019den az olmamak \u00fczere iki par\u00e7a halinde yap\u0131labilece\u011fini de dile getirdi.<\/p>\n<p>GET Baltic \u0130\u015f Geli\u015ftirme \u015eefi Gintaras Buzkys ise a\u00e7\u0131klamas\u0131nda, b\u00f6yle bir ihalenin Balt\u0131k \u00fclkelerinde ilk kez d\u00fczenlendi\u011fine vurgu yaparak \u201cBundan dolay\u0131 Balt\u0131k \u00fclkelerindeki do\u011falgaz piyasas\u0131n\u0131n t\u00fcm kat\u0131l\u0131mc\u0131lar\u0131n\u0131 en iyi fiyatlar\u0131 sunarak a\u00e7\u0131k art\u0131rmaya aktif olarak kat\u0131lmalar\u0131n\u0131 bekliyoruz\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Litvanya do\u011fal gaz piyasas\u0131 operat\u00f6r\u00fc GET Baltic taraf\u0131ndan Balt\u0131k\u2019taki do\u011falgaz \u015firketleri Litvanya\u2019daki Klaipeda LNG Terminali\u2019nden hacim fazlas\u0131 gaz sat\u0131\u015f\u0131 ihalesine kat\u0131lmalar\u0131na y\u00f6nelik \u00e7a\u011fr\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1128,19761,2092,23219,10776,67,1009,38716,12657,38717,2012,35454,2585,35870],"views":647,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77493"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77493"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77493\/revisions"}],"predecessor-version":[{"id":77495,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77493\/revisions\/77495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77494"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77493"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77493"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77493"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}