{"id":77460,"date":"2018-08-12T16:33:37","date_gmt":"2018-08-12T13:33:37","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77460"},"modified":"2018-08-12T16:33:37","modified_gmt":"2018-08-12T13:33:37","slug":"40-mw-gucundeki-buca-res-elazigda-kurulacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/40-mw-gucundeki-buca-res-elazigda-kurulacak\/","title":{"rendered":"(Turkish) 40 MW G\u00fcc\u00fcndeki &#8216;Buca RES&#8217; Elaz\u0131\u011f&#8217;da Kurulacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77460\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Buca R\u00fczgar G\u00fcne\u015f Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e., Elaz\u0131\u011f \u0130li&#8217;nin, Maden \u0130l\u00e7esi, Hanevleri, Akbo\u011fa, \u00c7ay\u0131rk\u00f6y, Dutp\u0131nar, \u00c7itlik\u00f6y, Topalu\u015fa\u011f\u0131, Yenibah\u00e7e Mahalleleri mevkiinde bulunan 40 MWm\/40 MWe kurulu g\u00fcc\u00fc olan &#8216;Buca RES (40 MWm\/40 MWe)&#8217; projesini kurarak i\u015fletecektir.<img loading=\"lazy\" class=\"alignright size-medium wp-image-77461\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/40-mw-gucundeki-buca-res-elazigda-kurulacak-300x198.jpg\" alt=\"\" width=\"300\" height=\"198\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/40-mw-gucundeki-buca-res-elazigda-kurulacak-300x198.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/40-mw-gucundeki-buca-res-elazigda-kurulacak-500x331.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/40-mw-gucundeki-buca-res-elazigda-kurulacak-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/40-mw-gucundeki-buca-res-elazigda-kurulacak.jpg 620w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>\u00c7eyrek milyar lira yat\u0131r\u0131m bedeline sahip olan santralle 18 adet t\u00fcrbini kurularak y\u0131lda 140.000.000 kWh elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecektir. Santralin kurulumu ise 18 ayda tamamlanacakt\u0131r.<\/p>\n<p>T\u00fcrkiye Elektrik \u0130letim A\u015e&#8217;nin (TE\u0130A\u015e) ge\u00e7ti\u011fimiz y\u0131l\u0131n sonunda d\u00fczenledi\u011fi r\u00fczgar enerji santrali kapasite tahsis ihaleleriyle Elaz\u0131\u011f&#8217;daki 40 MW&#8217;l\u0131k kapasite ile -0,63 dolar cent\/kWh rakamla Buca R\u00fczgar G\u00fcne\u015f Yenilenebilir Enerji ve Elektrik \u00dcretim A\u015e Buca RES projesini alm\u0131\u015ft\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Buca R\u00fczgar G\u00fcne\u015f Yenilenebilir Enerji ve Elektrik \u00dcretim A.\u015e., Elaz\u0131\u011f \u0130li&#8217;nin, Maden \u0130l\u00e7esi, Hanevleri, Akbo\u011fa, \u00c7ay\u0131rk\u00f6y, Dutp\u0131nar, \u00c7itlik\u00f6y, Topalu\u015fa\u011f\u0131, Yenibah\u00e7e Mahalleleri mevkiinde bulunan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[38809,38808,4249,68,67,1009,5562,474,35002,69,24949,231,34960],"views":1879,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77460"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77460"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77460\/revisions"}],"predecessor-version":[{"id":77462,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77460\/revisions\/77462"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77461"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77460"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77460"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77460"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}