{"id":77128,"date":"2018-08-05T14:19:14","date_gmt":"2018-08-05T11:19:14","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77128"},"modified":"2018-08-05T14:19:14","modified_gmt":"2018-08-05T11:19:14","slug":"erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak\/","title":{"rendered":"(Turkish) Erdo\u011fan: 3 Bin MW G\u00fcc\u00fcnde GES \u0130\u00e7in \u0130lana \u00c7\u0131k\u0131lacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77128\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye Cumhuriyeti&#8217;nin Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan taraf\u0131ndan Cumhurba\u015fkanl\u0131\u011f\u0131 Kabinesi\u2019nin g\u00f6reve geldikten sonraki ilk \u201c100 g\u00fcnl\u00fck \u0130craat Program\u0131\u201d d\u00fczenlenen toplant\u0131 ile a\u00e7\u0131kland\u0131.<\/strong><\/p>\n<p>Cumhurba\u015fkan\u0131 Erdo\u011fan taraf\u0131ndan a\u00e7\u0131klanan programda, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131n\u0131n <img loading=\"lazy\" class=\"alignleft size-medium wp-image-77129\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak-300x168.jpg\" alt=\"\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak-500x281.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/erdogan-3-bin-mw-gucunde-ges-icin-ilana-cikilacak.jpg 606w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>\u00e7al\u0131\u015fmalar\u0131 i\u00e7inde yakla\u015f\u0131k 4,8 milyar dolar yat\u0131r\u0131m tutar\u0131 olan toplam 3 bin megavat g\u00fcc\u00fcndeki g\u00fcne\u015f enerji santralleri i\u00e7in de ilana \u00e7\u0131k\u0131laca\u011f\u0131 belirtilirken ayr\u0131ca;<\/p>\n<p>\u2013 Do\u011falgaz\u2019da eri\u015fim imk\u00e2n\u0131 verilen vatanda\u015f say\u0131s\u0131 63 milyondan 66 milyona \u00e7\u0131kart\u0131lacak.<\/p>\n<p>\u2013 Akdeniz\u2019de bir derin deniz ve bir s\u0131\u011f deniz sondaj\u0131 yap\u0131lacak.<\/p>\n<p>\u2013 T\u00fcrkiye\u2019nin yer alt\u0131 kaynaklar\u0131 potansiyeli tespit edilerek ekonomiye kazand\u0131r\u0131lmas\u0131 sa\u011flanacak.<\/p>\n<p>\u2013 Yenilenebilir enerji kaynakl\u0131 elektrik \u00fcretim kurulu g\u00fcc\u00fcnde art\u0131\u015fa gidilecek.<\/p>\n<p>\u2013 K\u0131ymetli maden sahalar\u0131na y\u00f6nelik ihale d\u00fczenlenecek.<\/p>\n<p>\u2013 \u00dcretim yap\u0131lmayan k\u00f6m\u00fcr sahalar\u0131n\u0131n \u00f6zel sekt\u00f6rce i\u015fletilmesi sa\u011flanacak.<\/p>\n<p>\u2013 Yerli k\u00f6m\u00fcr kaynaklar\u0131n\u0131n ekonomiye kazand\u0131r\u0131lmas\u0131na y\u00f6nelik; Eski\u015fehir Alpu\u2019da yakla\u015f\u0131k 1.000 MW kurulu g\u00fcc\u00fcnde termik santral kurulmas\u0131 i\u00e7in ihale d\u00fczenlenecek.<\/p>\n<p>\u2013 Yurt d\u0131\u015f\u0131 maden arama ve i\u015fletme faaliyetlerinin h\u0131zland\u0131r\u0131lmas\u0131na y\u00f6nelik T\u00fcrkiye\u2019nin kaya gaz\u0131 ve k\u00f6m\u00fcr kaynakl\u0131 metan gaz\u0131 \u00fcretim potansiyeli belirlenecek.<\/p>\n<p>\u2013 EP\u0130A\u015e b\u00fcnyesinde testleri yap\u0131lan do\u011falgaz ticaret platformunun sanal uygulamas\u0131 sonland\u0131r\u0131larak ger\u00e7ek uygulamaya ge\u00e7i\u015f yap\u0131lacak.<\/p>\n<p>\u2013 Elektrik, su, do\u011falgaz ve telefon gibi abonelik s\u00f6zle\u015fmelerinden kaynaklanan para alacaklar\u0131n\u0131n daha az masrafla ve daha k\u0131sa s\u00fcrede tahsil edilmesini sa\u011flayacak \u00e7al\u0131\u015fmalar ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>\u2013 Biyok\u00fctleye dayal\u0131 elektrik santral projelerinin say\u0131s\u0131n\u0131 da fazlala\u015ft\u0131racak nitelikte: Toplamda 20 adet kat\u0131 at\u0131k toplama, ta\u015f\u0131ma, geri kazan\u0131m ve bertaraf tesisini kapsayan Kat\u0131 At\u0131k Program\u0131 (KAP) devreye girecek.<\/p>\n<p>\u2013 End\u00fcstri 4.0 anlay\u0131\u015f\u0131yla yeniden yap\u0131land\u0131r\u0131lma gibi faaliyetlere y\u00f6nelik enerji sekt\u00f6r\u00fcne nitelikli i\u015fg\u00fcc\u00fc yeti\u015ftirilmesi \u00e7al\u0131\u015fmalar\u0131 yap\u0131lacak.<\/p>\n<p>\u2013 Yerli ve Milli Teknolojilerin Geli\u015ftirilmesi hedefi \u00e7er\u00e7evesinde Karap\u0131nar Enerji \u0130htisas End\u00fcstri B\u00f6lgesinde yer alacak yat\u0131r\u0131mc\u0131lara yer tahsisi yap\u0131lacakt\u0131r.<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye Cumhuriyeti&#8217;nin Cumhurba\u015fkan\u0131 Recep Tayyip Erdo\u011fan taraf\u0131ndan Cumhurba\u015fkanl\u0131\u011f\u0131 Kabinesi\u2019nin g\u00f6reve geldikten sonraki ilk \u201c100 g\u00fcnl\u00fck \u0130craat Program\u0131\u201d d\u00fczenlenen toplant\u0131 ile a\u00e7\u0131kland\u0131. Cumhurba\u015fkan\u0131 Erdo\u011fan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77129,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[38662,67,1009,23416,23133,23131,2063],"views":946,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77128"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77128"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77128\/revisions"}],"predecessor-version":[{"id":77130,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77128\/revisions\/77130"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77129"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77128"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77128"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77128"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}