{"id":77111,"date":"2018-08-04T15:37:32","date_gmt":"2018-08-04T12:37:32","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=77111"},"modified":"2018-08-04T15:37:32","modified_gmt":"2018-08-04T12:37:32","slug":"fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani\/","title":{"rendered":"(Turkish) Fransa&#8217;dan A\u015f\u0131r\u0131 S\u0131caklardan Dolay\u0131 3 N\u00fckleer Reakt\u00f6r\u00fc Kapatma Plan\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/77111\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Electricite de France S.A. taraf\u0131ndan Fransa\u2019n\u0131n g\u00fcneydo\u011fusundaki Rhone Nehri boyunca y\u00fcksek s\u0131cakl\u0131klardan \u00f6t\u00fcr\u00fc 3 n\u00fckleer reakt\u00f6r\u00fcn kapat\u0131lmas\u0131n\u0131n planland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131.<\/strong><span id=\"more-101291\"><\/span><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-77112\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani-300x216.jpg\" alt=\"\" width=\"300\" height=\"216\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani-300x216.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani-500x359.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/fransadan-asiri-sicaklardan-dolayi-3-nukleer-reaktoru-kapatma-plani.jpg 740w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Elektrik \u015firketi Electricite de France S.A.\u2019n\u0131n Fransa\u2019n\u0131n g\u00fcneydo\u011fusundaki Rhone Nehri boyunca y\u00fcksek s\u0131cakl\u0131klara ba\u011fl\u0131 olarak 3 n\u00fckleer reakt\u00f6r\u00fcn\u00fc kapatmas\u0131 planlanmaktad\u0131r.<\/p>\n<p>EDF, reakt\u00f6rleri so\u011futmaya y\u00f6nelik nehrin sular\u0131n\u0131 kullan\u0131rken yay\u0131mlanan haberde \u015firketin elektrik \u00fcretimini St. Alban\u2019da kurulu 2,300 megawatt kapasiteli ve 900 megavatl\u0131k Bugey reakt\u00f6rleri ile iki reakt\u00f6rde durdurmaya zorlanabilece\u011fi a\u00e7\u0131kland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Electricite de France S.A. taraf\u0131ndan Fransa\u2019n\u0131n g\u00fcneydo\u011fusundaki Rhone Nehri boyunca y\u00fcksek s\u0131cakl\u0131klardan \u00f6t\u00fcr\u00fc 3 n\u00fckleer reakt\u00f6r\u00fcn kapat\u0131lmas\u0131n\u0131n planland\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Elektrik \u015firketi Electricite de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":77112,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[24454,67,1009,1346,1133,21,23134,3767,25480,3020,88,34930],"views":1318,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77111"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=77111"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77111\/revisions"}],"predecessor-version":[{"id":77113,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/77111\/revisions\/77113"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/77112"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=77111"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=77111"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=77111"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}