{"id":76975,"date":"2018-08-01T12:05:40","date_gmt":"2018-08-01T09:05:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76975"},"modified":"2018-08-01T12:06:01","modified_gmt":"2018-08-01T09:06:01","slug":"teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi\/","title":{"rendered":"(Turkish) TE\u0130A\u015e&#8217;tan Akkuyu NGS\u2019nin Elektri\u011finin \u0130letimine Y\u00f6nelik \u00c7al\u0131\u015fmalar Ba\u015flat\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76975\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>TE\u0130A\u015e taraf\u0131ndan Mersin\u2019de kurulacak olan T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali Akkuyu NGS\u2019de \u00fcretilen elektri\u011fin Antalya\u2019n\u0131n Manavgat il\u00e7esine iletilmesine y\u00f6nelik iletim hatt\u0131 kurulacak.<\/strong><span id=\"more-101239\"><\/span><\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-76976\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi-300x151.jpg\" alt=\"\" width=\"300\" height=\"151\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi-300x151.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi-500x252.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/teiastan-akkuyu-ngsnin-elektriginin-iletimine-yonelik-calismalar-baslatildi.jpg 745w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>T\u00fcrkiye Elektrik \u0130letim A.\u015e. Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc&#8217;nce Mersin ili, G\u00fclnar il\u00e7esinde kurulmas\u0131 planlanan Akkuyu N\u00fckleer G\u00fc\u00e7 Santrali kapsam\u0131nda kurulacak Akkuyu NGS TM ile Antalya ili, Manavgat il\u00e7esi s\u0131n\u0131rlar\u0131 i\u00e7erisinde kurulmas\u0131 planlanan Manavgat TM aras\u0131nda 380 kV Akkuyu NGS \u2013 Manavgat 380 TM Elektrik Enerjisi \u0130letim Hatt\u0131 kurularak i\u015fletilecek. TE\u0130A\u015e iletim hatt\u0131 i\u00e7in yakla\u015f\u0131k 80 milyon lira yat\u0131r\u0131m ger\u00e7ekle\u015ftirilecek.<\/p>\n<p>Hatt\u0131n gerilimi 380 kV ve uzunlu\u011fu 211 kilometre olup yakla\u015f\u0131k 93 km\u2019lik k\u0131sm\u0131 Mersin, 118 km\u2019 lik k\u0131sm\u0131 ise Antalya ili s\u0131n\u0131rlar\u0131 i\u00e7erisinden ge\u00e7ecektir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.TE\u0130A\u015e taraf\u0131ndan Mersin\u2019de kurulacak olan T\u00fcrkiye\u2019nin ilk n\u00fckleer enerji santrali Akkuyu NGS\u2019de \u00fcretilen elektri\u011fin Antalya\u2019n\u0131n Manavgat il\u00e7esine iletilmesine y\u00f6nelik iletim hatt\u0131 kurulacak. T\u00fcrkiye [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76976,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,43],"tags":[3019,2159,67,1009,1133,23134,3767,25480,34930,1582],"views":883,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76975"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76975"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76975\/revisions"}],"predecessor-version":[{"id":76977,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76975\/revisions\/76977"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76976"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76975"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76975"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76975"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}