{"id":76969,"date":"2018-08-01T11:52:11","date_gmt":"2018-08-01T08:52:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76969"},"modified":"2018-08-01T11:57:11","modified_gmt":"2018-08-01T08:57:11","slug":"926-mw-elektrik-uretim-kapasitesinin-yuzde-86si-yerli-kaynaklardan","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/926-mw-elektrik-uretim-kapasitesinin-yuzde-86si-yerli-kaynaklardan\/","title":{"rendered":"(Turkish) 926 MW Elektrik \u00dcretim Kapasitesinin Y\u00fczde 86\u2019s\u0131 Yerli Kaynaklardan!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76969\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019de ocak-haziran d\u00f6neminde devreye al\u0131nan 926 megavat elektrik \u00fcretim kapasitesinin 756 megavat\u0131n\u0131 (y\u00fczde 86) yerli kaynaklar olu\u015fturdu.<\/strong><\/p>\n<p><span id=\"more-101223\"><\/span>Enerji sekt\u00f6r\u00fcnde yerli ve yenilenebilir kaynak kullan\u0131m\u0131n\u0131 art\u0131rma hedefi kapsam\u0131nda, hidroelektrik, r\u00fczg\u00e2r, jeotermal, biyok\u00fctle ve g\u00fcne\u015f enerjisi santrallerine y\u00f6nelik yat\u0131r\u0131mlar art\u0131yor. Enerji ve Tabii <img loading=\"lazy\" class=\"alignright size-medium wp-image-76970\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/yenilenebilir-enerji-gunes-ruzgar-gidahatti-300x182.jpg\" alt=\"\" width=\"300\" height=\"182\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/yenilenebilir-enerji-gunes-ruzgar-gidahatti-300x182.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/yenilenebilir-enerji-gunes-ruzgar-gidahatti-500x304.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/yenilenebilir-enerji-gunes-ruzgar-gidahatti-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/08\/yenilenebilir-enerji-gunes-ruzgar-gidahatti.jpg 612w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Kaynaklar Bakanl\u0131\u011f\u0131 verilerine g\u00f6re, haziran sonu itibar\u0131yla T\u00fcrkiye\u2019nin elektrikte toplam kurulu g\u00fcc\u00fc 86 bin megavat\u0131 ge\u00e7ti. Y\u0131l\u0131n ilk yar\u0131s\u0131nda 926 megavat kapasiteli 58 elektrik \u00fcretim santrali devreye al\u0131nd\u0131. Bu santrallerden 44\u2019\u00fc yerli enerji kaynaklar\u0131ndan meydana geldi. Ocak-haziran d\u00f6neminde 510.6 megavat kapasiteli 14 hidroelektrik santrali, 138.4 megavat kapasiteye sahip 16 r\u00fczg\u00e2r enerjisi santrali ve 80.5 megavat kapasiteli 2 jeotermal enerji santrali i\u015fletmeye al\u0131nd\u0131.<\/p>\n<p>Bunlarla birlikte biyok\u00fctle, \u00e7\u00f6p gaz\u0131 ve g\u00fcne\u015f enerjisi santrallerinin olu\u015fturdu\u011fu 26.5 megavatl\u0131k 12 santralde daha elektrik \u00fcretimine ge\u00e7ti. Alt\u0131 ayl\u0131k d\u00f6nemde 132 megavat kapasiteye sahip 11 do\u011falgaz santrali devreye al\u0131n\u0131rken, 24 megavat kapasiteli bir ithal k\u00f6m\u00fcr, 13.3 megavatl\u0131k bir do\u011falgaz-fuel oil santrali ile 1 megavatl\u0131k do\u011falgaz- s\u0131v\u0131la\u015ft\u0131r\u0131lm\u0131\u015f gaz santrali de i\u015fletmeye girdi.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019de ocak-haziran d\u00f6neminde devreye al\u0131nan 926 megavat elektrik \u00fcretim kapasitesinin 756 megavat\u0131n\u0131 (y\u00fczde 86) yerli kaynaklar olu\u015fturdu. Enerji sekt\u00f6r\u00fcnde yerli ve yenilenebilir kaynak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76970,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,46,51,53,49,47,48,50],"tags":[4725,4996,67,1009,13,23416,23131,34926,474,105],"views":1465,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76969"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76969"}],"version-history":[{"count":4,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76969\/revisions"}],"predecessor-version":[{"id":76974,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76969\/revisions\/76974"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76970"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76969"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76969"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76969"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}