{"id":76945,"date":"2018-07-31T11:38:39","date_gmt":"2018-07-31T08:38:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76945"},"modified":"2018-07-31T11:38:39","modified_gmt":"2018-07-31T08:38:39","slug":"ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) \u00d6zbekistan&#8217;da 100 MW G\u00fcc\u00fcnde G\u00fcne\u015f Santrali Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76945\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji \u00fcretimini \u00e7e\u015fitlendirmeye y\u00f6nelik \u00d6zbekistan\u2019da h\u00fck\u00fcmet taraf\u0131ndan n\u00fckleer ve r\u00fczgar santralleri in\u015fa etmek i\u00e7in al\u0131nan karar\u0131n ard\u0131ndan \u015fimdi de g\u00fcne\u015f enerjisi santrali kurulumu i\u00e7in \u00e7al\u0131\u015fmalara ba\u015flad\u0131.\u00a0<span id=\"more-101212\"><\/span>Cumhurba\u015fkan\u0131 \u015eevket Mirziyoyev taraf\u0131ndan imzalanan karar \u00e7er\u00e7evesinde, Cayman Adalar\u0131\u2019ndan Sky Power Global \u015firketi, \u00d6zbekistan\u2019\u0131n ilk g\u00fcne\u015f enerjisi santrali kurulumu yapacak.<\/strong><\/p>\n<p><img loading=\"lazy\" class=\"alignright size-medium wp-image-76946\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak-500x333.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/ozbekistanda-100-mw-gucunde-gunes-santrali-kurulumu-yapilacak.jpg 732w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Yat\u0131r\u0131m bedelinin 130 milyon dolar oldu\u011fu g\u00fcne\u015f enerjisi santralinin 2021&#8217;e kadar tamamlanmas\u0131 planlan\u0131rken, 100 megavat kapasiteli santralin \u00fclkenin Semerkant kentinde in\u015fa edilecektir.<\/p>\n<p>Sky Power Global\u2019in, s\u00f6z konusu projeyi hayata ge\u00e7irmesinin ard\u0131ndan \u00fclkenin \u00e7e\u015fitli b\u00f6lgelerinde de 200, 300 ve 400 megavat kapasiteli 3 g\u00fcne\u015f enerjisi santralini daha in\u015fa edece\u011fi planlanmaktad\u0131r.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji \u00fcretimini \u00e7e\u015fitlendirmeye y\u00f6nelik \u00d6zbekistan\u2019da h\u00fck\u00fcmet taraf\u0131ndan n\u00fckleer ve r\u00fczgar santralleri in\u015fa etmek i\u00e7in al\u0131nan karar\u0131n ard\u0131ndan \u015fimdi de g\u00fcne\u015f enerjisi santrali kurulumu [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76946,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[67,1009,18,2326,13,23416,2569,23133,2401,26059,23131,10997],"views":830,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76945"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76945"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76945\/revisions"}],"predecessor-version":[{"id":76947,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76945\/revisions\/76947"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76946"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76945"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76945"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76945"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}