{"id":76905,"date":"2018-07-30T17:27:25","date_gmt":"2018-07-30T14:27:25","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76905"},"modified":"2018-07-30T17:53:34","modified_gmt":"2018-07-30T14:53:34","slug":"deniz-ustu-res-projesinin-yatirim-tutari-3-milyar-dolari-gececek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/deniz-ustu-res-projesinin-yatirim-tutari-3-milyar-dolari-gececek\/","title":{"rendered":"(Turkish) &#8221;Deniz \u00dcst\u00fc RES Projesinin Yat\u0131r\u0131m Tutar\u0131 3 Milyar Dolar\u0131 Ge\u00e7ecek&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76905\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin denizde kuraca\u011f\u0131 ilk r\u00fczg\u00e2r santralleri Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) projesinde sona yakla\u015f\u0131ld\u0131. D\u00fcnyan\u0131n en b\u00fcy\u00fck deniz \u00fcst\u00fc (offshore) r\u00fczg\u00e2r enerjisi yat\u0131r\u0131m\u0131 olacak santrallerden ilk elektrik \u00fcretimi i\u00e7in takvimler 2023 y\u0131l\u0131n\u0131 g\u00f6steriyor.<\/strong><\/p>\n<p>Tekliflerin 23 Ekim tarihi itibari ile al\u0131naca\u011f\u0131n\u0131 belirten T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven \u201c3 milyar dolardan fazla yat\u0131r\u0131m olaca\u011f\u0131n\u0131 \u00f6ng\u00f6r\u00fcyoruz\u201d dedi. Bir grup <strong><img loading=\"lazy\" class=\"size-medium wp-image-76907 alignleft\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar-300x178.jpg\" alt=\"\" width=\"300\" height=\"178\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar-300x178.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar-768x456.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar-500x297.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/offshore-r\u00fczgar.jpg 821w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>gazeteciyle bir araya gelerek sorular\u0131 cevapland\u0131ran Ataseven, yat\u0131r\u0131m tutar\u0131 1,5 milyar dolar olan bin\u00a0megavat\u0131n \u00fczerindeki kapasite art\u0131\u015f talebinin de kar\u015f\u0131lanmas\u0131yla r\u00fczg\u00e2r sekt\u00f6r\u00fcndeki ilerleyi\u015fin h\u0131zlanaca\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Off-shore ile ilgili d\u00fczenlemenin Resmi Gazete\u2019de yay\u0131mland\u0131\u011f\u0131n\u0131 an\u0131msatan Ataseven \u201cSaros, Gelibolu-\u015eark\u00f6y ve K\u0131y\u0131k\u00f6y aday b\u00f6lgeler olarak belirlendi. Kapasite bin 200 megavat. \u0130lk etapta 840 megavat devreye al\u0131nacak. Kalan k\u0131s\u0131m da s\u00f6zle\u015fme tarihi itibar\u0131yla 72 ay i\u00e7inde tamamlanacak. T\u00fcrbin \u00fcnite g\u00fcc\u00fc minimum 6 megavat olacak. Bunun sebebi yeni teknolojiyle hayata ge\u00e7mesi isteniyor. T\u00fcrbin ekipman\u0131n\u0131n y\u00fczde 60\u2019\u0131 yerli olacak. Y\u00fczde 80 yerli m\u00fchendis istihdam \u015fart\u0131 aranacak. Lisans s\u00fcresi 30 y\u0131l. Kat\u0131l\u0131m i\u00e7in 100 milyon dolarl\u0131k teminat mektubu istenecek\u201d ifadelerini kulland\u0131.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin denizde kuraca\u011f\u0131 ilk r\u00fczg\u00e2r santralleri Yenilenebilir Enerji Kaynak Alanlar\u0131 (YEKA) projesinde sona yakla\u015f\u0131ld\u0131. D\u00fcnyan\u0131n en b\u00fcy\u00fck deniz \u00fcst\u00fc (offshore) r\u00fczg\u00e2r enerjisi yat\u0131r\u0131m\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76907,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[38586,38588,19,67,1009,117,3388,38587,474,35002,16,24949,231,4013,1682,3390,8275,105],"views":866,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76905"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76905"}],"version-history":[{"count":6,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76905\/revisions"}],"predecessor-version":[{"id":76918,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76905\/revisions\/76918"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76907"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76905"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76905"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76905"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}