{"id":76899,"date":"2018-07-30T16:27:31","date_gmt":"2018-07-30T13:27:31","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76899"},"modified":"2018-07-30T16:28:42","modified_gmt":"2018-07-30T13:28:42","slug":"kosovadaki-gurise-ait-ruzgar-santralinin-elektrik-satis-anlasmasi-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kosovadaki-gurise-ait-ruzgar-santralinin-elektrik-satis-anlasmasi-yapildi\/","title":{"rendered":"(Turkish) Kosova\u2019daki G\u00fcri\u015f&#8217;e Ait R\u00fczgar Santralinin Elektrik Sat\u0131\u015f Anla\u015fmas\u0131 Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76899\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Kamenica\/Kitka b\u00f6lgesinde 32.4 MW kurulu g\u00fcce sahip \u2018Kitka\u2019 RES projesinin elektrik sat\u0131\u015f anla\u015fmas\u0131 PPA (Power Purchase Agreement \u2013 Enerji Al\u0131m Anla\u015fmas\u0131) Kosova sistem operat\u00f6r\u00fc KOSTT ile kar\u015f\u0131l\u0131kl\u0131 olarak imzaland\u0131.<img loading=\"lazy\" class=\"alignright size-medium wp-image-76900\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi-300x169.jpg\" alt=\"\" width=\"300\" height=\"169\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi-300x169.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi-768x433.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi-500x282.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi-80x45.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/guris-holdinge-ait-kosovada-bulunan-32-4-mw-kitka-ruzgar-enerji-santralinin-elektrik-satis-anlasmasi-yapildi.jpg 866w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Anla\u015fmayla Kosova Devleti\/KOSTT 12 y\u0131l boyunca elektrik al\u0131m\u0131n\u0131 G\u00dcR\u0130\u015e Holding\u2019e garanti etti. 9 Adet GE 3,6 MW t\u00fcrbinden olu\u015fan santralin 2018 Eyl\u00fcl ay\u0131 i\u00e7erisinde elektrik sat\u0131\u015f\u0131na ba\u015flanmas\u0131 \u00f6ng\u00f6r\u00fclmektedir.<\/p>\n<p>Kosova&#8217;n\u0131n ilk r\u00fczgar enerji santrali olma \u00f6zelli\u011fini ta\u015f\u0131yan Kitka RES\u2019 in 95.600.000 Kws\/Y\u0131l elektrik \u00fcretmesi beklenmektedir.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Kamenica\/Kitka b\u00f6lgesinde 32.4 MW kurulu g\u00fcce sahip \u2018Kitka\u2019 RES projesinin elektrik sat\u0131\u015f anla\u015fmas\u0131 PPA (Power Purchase Agreement \u2013 Enerji Al\u0131m Anla\u015fmas\u0131) Kosova sistem [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76900,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,50],"tags":[38580,38583,67,1009,6320,38582,5326,38584,474,35002,38581,24949,231,23318,312],"views":864,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76899"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76899"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76899\/revisions"}],"predecessor-version":[{"id":76901,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76899\/revisions\/76901"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76900"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76899"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76899"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76899"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}