{"id":76855,"date":"2018-07-29T16:27:01","date_gmt":"2018-07-29T13:27:01","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76855"},"modified":"2018-07-29T16:27:01","modified_gmt":"2018-07-29T13:27:01","slug":"akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi\/","title":{"rendered":"(Turkish) Akfen Holding&#8217;ten Van&#8217;a 55 Milyon Dolarl\u0131k GES Yat\u0131r\u0131m\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76855\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan g\u00fcne\u015f enerjisinden elektrik \u00fcretimi sa\u011flayan b\u00f6lgeler i\u00e7inde en y\u00fcksek ikinci kotay\u0131 sahip olunan Van\u2019da, yakla\u015f\u0131k 55 milyon dolarl\u0131k yat\u0131r\u0131m ile ilk lisansl\u0131 G\u00fcne\u015f Enerjisi Santrali tesisi kurulumu ger\u00e7ekle\u015ftiriliyor.<\/strong><\/p>\n<p>Akfen Holding&#8217;in Edremit il\u00e7esinde 600 bin metrekarelik alanda kurulum \u00e7al\u0131\u015fmalar\u0131 devam eden 30MW kapasiteli GES\u2019in, 20 megavatl\u0131k ilk etab\u0131n\u0131n eyl\u00fcle kadar \u00fcretime ge\u00e7mesi planlanmaktad\u0131r.<\/p>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-76856\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-300x131.jpg\" alt=\"\" width=\"300\" height=\"131\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-300x131.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-768x336.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-1024x448.jpg 1024w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-500x219.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi-80x35.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/akfen-holdingten-vana-55-milyon-dolarlik-ges-yatirimi.jpg 1280w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>29 Nisan 2015\u2019te Van i\u00e7in ger\u00e7ekle\u015ftirilen yar\u0131\u015fmayla T\u00fcrkiye\u2019de megavat ba\u015f\u0131na 2 milyon 960 bin lirayla en y\u00fcksek katk\u0131 pay\u0131n\u0131 Akfen Holding b\u00fcnyesinde yer alan Akfen Yenilenebilir Enerji\u2019nin verdi\u011fini belirten Do\u011fu Anadolu Kalk\u0131nma Ajans\u0131 (DAKA) Genel Sekreteri Halil \u0130brahim G\u00fcray, s\u00f6zlerini \u015f\u00f6yle s\u00fcrd\u00fcrd\u00fc:<\/p>\n<p>\u201cBu rekor katk\u0131 pay\u0131 ile Van\u2019\u0131n GES yat\u0131r\u0131mlar\u0131ndaki yeri ve \u00f6nemi \u00f6zel sekt\u00f6r taraf\u0131ndan tescillenmi\u015f oldu. Akfen Yenilenebilir Enerji, toplamda 88 milyon 356 bin lira teklif ile Van i\u00e7in ayr\u0131lan 77 megavat kapasitenin 30 megavat\u0131n\u0131 elde ederek \u00f6n lisans alma hakk\u0131na kavu\u015ftu. Bu kapsamda \u00f6zellikle Say\u0131n Valimiz Murat Zorluo\u011flu ba\u015fkanl\u0131\u011f\u0131nda DAKA olarak ilgili firman\u0131n Van\u2019daki yat\u0131r\u0131mlarla ilgili b\u00fcrokratik i\u015flemlerinin h\u0131zland\u0131r\u0131lmas\u0131 i\u00e7in devreye girdik. Kalk\u0131nma ajanslar\u0131n\u0131n g\u00f6revlerinden biri de yat\u0131r\u0131mc\u0131lar\u0131n izin ve ruhsatlar\u0131n\u0131n yerelde takip edilmesidir. Bu kapsam ile s\u00fcrecin h\u0131zlanmas\u0131n\u0131 sa\u011flad\u0131k ve \u015fu anda 30 megavatl\u0131k yat\u0131r\u0131m\u0131n 20 megavatl\u0131k k\u0131sm\u0131 tamamlanmak \u00fczeredir ve eyl\u00fclde hizmete al\u0131nacakt\u0131r. Kalan 10 megavat ise \u00f6n\u00fcm\u00fczdeki y\u0131l bitirilerek devreye girecektir. B\u00f6ylece toplamda 30 megavat yat\u0131r\u0131m ilimize kazand\u0131r\u0131lacakt\u0131r.\u201d<\/p>\n<p>Akfen Yenilenebilir Enerji hakk\u0131nda detayl\u0131 bilgi i\u00e7in\u00a0<a href=\"http:\/\/www.akfen.com.tr\/yenilenebilir-enerji\" target=\"_blank\" rel=\"noopener\">http:\/\/www.akfen.com.tr\/yenilenebilir-enerji<\/a> adresini ziyaret edebilirsiniz.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 taraf\u0131ndan g\u00fcne\u015f enerjisinden elektrik \u00fcretimi sa\u011flayan b\u00f6lgeler i\u00e7inde en y\u00fcksek ikinci kotay\u0131 sahip olunan Van\u2019da, yakla\u015f\u0131k 55 milyon [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49],"tags":[28245,67,1009,2326,23416,2569,23133,23131,38562,38563],"views":1264,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76855"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76855"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76855\/revisions"}],"predecessor-version":[{"id":76857,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76855\/revisions\/76857"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76856"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76855"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76855"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76855"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}