{"id":76811,"date":"2018-07-29T00:26:34","date_gmt":"2018-07-28T21:26:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76811"},"modified":"2018-07-29T00:27:38","modified_gmt":"2018-07-28T21:27:38","slug":"misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi\/","title":{"rendered":"(Turkish) M\u0131s\u0131r&#8217;da 500 MW G\u00fcc\u00fcndeki R\u00fczgar Projesine Y\u00f6nelik S\u00f6zle\u015fme Yap\u0131ld\u0131"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76811\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>M\u0131s\u0131r&#8217;\u0131n k\u0131z\u0131l deniz k\u0131y\u0131s\u0131nda yap\u0131lacak Ras Garip r\u00fczgar enerjisi projesiyle M\u0131s\u0131rl\u0131 Orascom Construction, Frans\u0131z Engie, Japon Toyota Tsusho Corporation ve Erus Energy Holdings Corporation konsorsiyumunca hayata ge\u00e7irilecek.<\/strong><\/p>\n<p><strong><img loading=\"lazy\" class=\"alignleft size-medium wp-image-76812\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi-300x200.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/misirda-500-mw-gucundeki-ruzgar-projesine-yonelik-sozlesme-yapildi-75x50.jpg 75w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong>Yap-\u0130\u015flet modeliyle in\u015fa edilecek santralin arazisi de M\u0131s\u0131r Yeni ve Yenilenebilir Enerji \u0130daresince temin edilecek.<\/p>\n<p>Konsorsiyum projesine y\u00f6nelik 2015&#8217;in nisan ay\u0131nda yap\u0131lan yar\u0131\u015fmada santralde \u00fcretilecek elektrik i\u00e7in 4,1 dolar-sent\/kilovat-saatlik teklif ile kazan\u0131lm\u0131\u015ft\u0131. Projenin finansman sa\u011flama ve izin s\u00fcre\u00e7leri sonunda 2019 y\u0131l\u0131n\u0131n ikinci veya \u00fc\u00e7\u00fcnc\u00fc \u00e7eyre\u011finde in\u015fa \u00e7al\u0131\u015fmalar\u0131n\u0131n ba\u015flanmas\u0131 planlan\u0131yor.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.M\u0131s\u0131r&#8217;\u0131n k\u0131z\u0131l deniz k\u0131y\u0131s\u0131nda yap\u0131lacak Ras Garip r\u00fczgar enerjisi projesiyle M\u0131s\u0131rl\u0131 Orascom Construction, Frans\u0131z Engie, Japon Toyota Tsusho Corporation ve Erus Energy Holdings [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76812,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[67,1009,474,24949,231,23318,34960],"views":950,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76811"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76811"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76811\/revisions"}],"predecessor-version":[{"id":76815,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76811\/revisions\/76815"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76812"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76811"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76811"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76811"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}