{"id":76808,"date":"2018-07-29T00:12:39","date_gmt":"2018-07-28T21:12:39","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=76808"},"modified":"2018-07-29T00:13:09","modified_gmt":"2018-07-28T21:13:09","slug":"sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak\/","title":{"rendered":"(Turkish) Sakarya\u2019da 8 MW\u2019l\u0131k Biyok\u00fctle Tesisi Kurulumu Yap\u0131lacak"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/76808\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Karadeniz Garanti Biyok\u00fctle Enerji taraf\u0131ndan Sakaraya\u2019n\u0131n S\u00f6\u011f\u00fctl\u00fc il\u00e7esinde yer alan OSB i\u00e7inde tar\u0131m ve ormanc\u0131l\u0131k at\u0131klar\u0131 elektri\u011fe \u00e7evirecek 8 MW g\u00fcc\u00fcnde biyok\u00fctle tesisi kurulumu yap\u0131lacak.<img loading=\"lazy\" class=\"alignright size-medium wp-image-76809\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak-300x161.jpg\" alt=\"\" width=\"300\" height=\"161\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak-300x161.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak-768x412.jpg 768w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak-500x269.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak-80x43.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2018\/07\/sakaryada-8-mwlik-biyokutle-tesisi-kurulumu-yapilacak.jpg 1000w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/strong><\/p>\n<p>Karadeniz Garanti Biyok\u00fctle Enerji Tesisileri San. Ve Tic. Ltd. \u015eti.&#8217;nin Sakarya \u0130li, S\u00f6\u011f\u00fctl\u00fc \u0130l\u00e7esi, Sakarya III. Organize Sanayi B\u00f6lgesi\u2019nde biyok\u00fctleden enerji \u00fcretimi tesisi kurulacakt\u0131r.<\/p>\n<p>Kurulacak tesis ile g\u00fcnde ortalama 90 ton biyok\u00fctlenin yak\u0131lmas\u0131ndan sa\u011flanan enerji, buhar t\u00fcrbinine aktar\u0131lacak ve elde edilen mekanik enerji elektrik enerjisine \u00e7evrilerek ortalama 8MWe (35MWt) kapasite ile elektrik \u00fcretimi ger\u00e7ekle\u015ftirecek. Tesiste bir y\u0131lda toplam da 63.360 MWh elektrik \u00fcretimi ger\u00e7ekle\u015ftirilecek.<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Karadeniz Garanti Biyok\u00fctle Enerji taraf\u0131ndan Sakaraya\u2019n\u0131n S\u00f6\u011f\u00fctl\u00fc il\u00e7esinde yer alan OSB i\u00e7inde tar\u0131m ve ormanc\u0131l\u0131k at\u0131klar\u0131 elektri\u011fe \u00e7evirecek 8 MW g\u00fcc\u00fcnde biyok\u00fctle tesisi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":76809,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[22893,53],"tags":[35143,29816,35325,68,67,1009,38545,38549,1545,38546,38547,38548],"views":2642,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76808"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=76808"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76808\/revisions"}],"predecessor-version":[{"id":76810,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/76808\/revisions\/76810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/76809"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=76808"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=76808"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=76808"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}